Loading...
Pipeline 07 30 2010N E w s The Pipeline Public Works Engineering 2010 • • •io r Public Works The Parks Crew started striping paint off hockey boards so they can be repainted. Mold was striped off park benches at Mendakota Park near the backstop and a natural toner applied. Graffiti was removed from the walls on the pavilion at Rogers Lake Park. Picnic tables were brought to Visitation School for the tennis picnic. Picnic tables were also brought to Rogers Lake for a large party. Rich cleaned the sanitary sewer lines on Wachtler Avenue, Haverton Court and Canton Court. Fire hydrants were painted on Wachtler and Wentworth Avenues. The Streets Crew brought dump truck 303 to Crysteel for warranty work. They patched potholes on the Hwy 110 Frontage Road from South Lane to Delaware Avenue. They also patched potholes on Warrior Drive, Sibley Court, High Ridge Circle and the pedway that runs from Warrior Drive to Marie Avenue. A signal light bulb that burnt out was replaced on north bound 110 and Mendota Heights Road. A downed tree was hauled away from a house on Sylvandale Road. Engineering 2010 Reconstruction - most of the concrete and curbing has been installed. The contractor is scheduling paving next week for streets and driveways. Mendota Heights Road Roundabout - The roundabout has been graded and vegetation controls are installed. The final lift of pavement is scheduled for next Thursday with a potential reopening on August 10 -11tH Water Tower Rehabilitation - Weather has been slightly more cooperative for the project. When the containment system is down you can see the areas that have been blasted and primed. The project should be complete towards the end of September. Dodd Road Closure - Qwest has a large utility line that will need to be relocated for the project to move forward. The relocated line may extend the completion date approximately three weeks. Mendota Heights opposes the extension as response time from emergency services will increase and the project is adjacent to Somerset Elementary School and would be ongoing at the start of the school year.