Loading...
Pipeline 05 28 2010NEWS LETTER The Pipeline Public Works Engineering Code Enforcement May 28, 2010 Public Works tG�v The Parks Crew planted flowers at Mendakota Park around the concession stand and sign. They finished spraying total week kill along the fence lines and warning tracks on the ball fields. The drive belt was repaired on the Xmark mower. Tree limbs were cleaned along the pedways and at Wentworth Park. Rich cleaned the sanitary sewer lines on Arbor Court, Arbor Court easement, Brookfield Lane, Wilshire Court, Concord Way, Heritage Drive and Lockwood Drive. He worked with Cliff to change the oil and filters on the portable generator for the lift stations. He sprayed right-of-ways with total weed killer. Rich did a sanitary sewer inspection on Wentworth Avenue. The Streets Crew cut up a very large cotton wood tree that fell on Brompton Place. A tree was cut down on the island at Wentworth Park, the top had broken off. Two trees on the pedway off Lilydale Road were picked up. The bobcat was steam cleaned so Cliff and Tim could fix a hydraulic leak. New cutting blades were put on the chipper and it was then power washed to get the grease off. Engineering 2010 Street Reconstruction - The utilities were installed on Spring Street this week. Next week utilities will be installed on John Street and Esther Lane. Dakota County Delaware Avenue/494 Visioning Study - On Wednesday evening, Ryan attended the public informational meeting regarding the 494/Delaware interchange study. BBO - City Hell held a BBQ for Public Works in honor of National Public Works Week. Budget Time - Ryan has been working hard on the 2011 budget.