The Parks Crew continues to check the aerator at Rogers Lake daily. They
cleaned up units 505 and 506 (the snow blower and broom) to prepare
them for the summer. They also cleaned up the old Cushman utility vehicle
to get it ready for the trade-in.
Rich attended a traffic safety seminar. He worked on truck 404 with Cliff
changing the oil, filters and pump oil for the jet.
The Streets Crew made up missing street signs for Huber Drive and
Hampshire Drive and installed them. The ice was scraped up off Marie
Avenue with the grader. Storm grates that were plugged were opened.
They continue to do pothole patching. Tom, Rich, George, John Ambrose,
Tim and Andy attended a work zone traffic control seminar at Mystic Lake
casino.
Engineering
Water Tower Rehabilitation Project - Bids were opened on Tuesday, March
9, 2010. The low bid of $1,118,000 by Odland Protective Coatings will be
recommended to the City Council on March 16t"
2010 Reconstruction Project - Staff is completing plans and will be
requesting the Council to authorize staff to advertise the project for bids.
The bid opening is scheduled for April 13t"
Highway 55/Mendota Heights Road - Staff is working with property owners
on obtaining roadway easements. A utility meeting was held with private
utility representatives. Two power poles and several pedestals will need to
be relocated with this project.