Loading...
Pipeline 01 22 2010N E W S The Pipeline LETTER AO Public Works Engineering Code Enforcement January 22, 2010 O Public Works The Parks Crew repaired the light at the Friendly Hills hockey rink. The rinks are still being flooded and broomed daily. The hockey goal was repaired at Marie Park. The door handle was repaired at the Marie Park warming house. Rich cleaned the floats at the Centre Point lift station. There were two watermain breaks this week on Timmy Street and Pontiac Place. The Streets Crew opened the fire hydrant at Copperfield, Huber Drive area with the tractor. They worked on a plow truck, taking the wing hydraulic cylinders off and took them to Ziegler to get rebuilt. John Ambrose did some welding for the Parks Crew. He worked on the ground master - welding up the cab brackets that were broken off. Engineering Drainage issues - Staff met with residents from the Park Place Association Board regarding assessing a storm water pond for potential improvements. The residents stated a noticeable change to the pond over the years; they were informed the city would assess the pond during the growing season. The Minnesota Pollution Control Agency (MPCA) held a stake holders meeting to cover additional requirements in the new permit. The city will be required to meet the new requirements (not yet defined) and apply for new permit coverage. Lake Augusta has been added to the draft DNR impaired water list. If the lake stays on for the final list the city will be required to perform a study and utilize methods aimed at improving water quality. Roundabout, Mendota Heights Road/Visitation Drive - Staff continues to work with the consultant, contractor and schools to secure additional funding and reduce overall project costs in an effort to get the project back in line with the original estimate. Staff met with SPRWS about the utilities planned meter change out program. They are anticipating changing all meters in Mendota Heights in 2011. An inflow and infiltration inspection could also be done in conjunction with the replacement. The city would need to pay for the additional I&I inspection but should see a cost savings once illegally connected sump pumps are removed from the sanitary sewer system. Staff met with Public Works to specify areas around town needing sewer cleaning and televising. The city was been doing overdue maintenance to the sewers in an effort to reduce claims and identify problems areas where groundwater is entering the system. Staff continues to work on construction plans for the 2010 reconstruction and rehabilitation project.