Loading...
Pipeline 06 22 2012L E T T E R Public Works Engineering Code Enforcement IUMVITIGM The Pipeline June 22, 2012 Public works have worked together this week assisting each other in the clean up from storm damage. Crews were called in early on Tuesday morning as the storm that hit caused extensive. damage to trees and overhead utilities. Large trees blocking major roadways were targeted first. Thank you public works for all your hard work and long hours this week. Engineering Lemay Lake Road Reconstruction -Bid opening took place on June 13th Valley Paving was the apparent low bidder. Contract award is scheduled for the June 19th City Council meeting. Construction is anticipated to begin in early to mid-July. Marie Avenue Rehabilitation - Water main construction is making good progress despite the weather which has sent several storms through town. The contractor adjusted their activities on site to accommodate residents who otherwise would have been stranded due to downed power lines at Marie and Delaware. Thank you to Northdale Construction and Hardrives, Inc. for assisting the city in the storm clean up. Marie Avenue is closed to through traffic. A signed detour is provided. Construction is anticipated to last through July. Diane Road Neighborhood - The contractor is working through the final punch -list items. Project is otherwise complete. An assessment hearing is scheduled for October. Mendota Heights Road Rehabilitation - The final lift of asphalt was installed and striping completed. The contractor is working through the final punch - list items. Project is otherwise complete. An assessment hearing is scheduled for October. Wagon Wheel Trail Bicycle/Pedestrian Connection - The contractor has placed the final lift of asphalt and completed the trail extension from I -35E to Lexington Avenue. Work should be completed following a final walk through by city staff. Dodd Road/Highway 110 Intersection Pedestrian Improvements -Consultant will be surveying on-site.over the next several weeks, and will be scheduling a mid -summer update before City Council. The following projects are under the direction of MnDOT and Dakota County. They are presented as information only. For more information on MnDOT projects contact J.P. Gillach (651-234-7503f Ames c i I lach @.state. m.n. us). Highway 13 Resurfacing (MnDOT) - The Resurfacing of Highway 13, along with drainage improvements and ADA upgrades between I -35W and Annapolis Street (Burnsville to St. Paul) has been underway for a month. The portion of Highway 13 from 2nd Street in Mendota to I -35E in Lilydale will be exempted from this project and reconstructed in 2015 under a separate MnDOT project. The Highway 55 to Highway 110 portion of the project is paved and striped. Highway 13 north of Wachtler Avenue to Sylvandalle Avenue is closed to through traffic through June 26th. A, signed detour for traffic is provided. Highway 110 Resurfacing (MnDOT) - A small portion of Highway 110 from Lexington Avenue east to the I -35E Bridge, along with spot repairs between Lexington and Highway 13 is being resurfaced. Construction is underway and is anticipated to continue through the end of July. Ramp form P, V M 1"r -W M • • Highway 11 will remain oRe •,, Use signed detour •