Loading...
Pipeline 02 24 2012L E T T E R Public Works Engineering Code Enforcement 5M-MMEMM February 24, 2012 A resident came into city hall and told Pam that public works does a "phenomenal job" salting and sanding Ivy Hills Drive and Dodd Road. One day she had to slam on her brakes to avoid hitting another car, but because the streets had been salted and sanded it had prevented her from getting into an accident. Her car did not slip or slide either because the roads were in good condition. Way to go Public WorksH The Parks Crew plowed the cul-de-sacs, trails, and parking lots on Tuesday morning. The skating rinks are now officially closed. The hockey nets were brought in as well as the flooding hoses and hydrant fittings for storage. The warming houses were also cleaned out. The wire harness for the plow lights were replaced on truck 502. The Utilities Crew plowed cu -de -sacs in the middle of the city and assisted the parks crew with closing of the skating rinks. Root killing chemicals were put down the sanitary sewer line from Cullen Avenue to Wagon Wheel Trail. The Streets Crew plowed and salted all city streets early Tuesday morning after the 2.7 inch snowfall. Plow truck 304 hit a manhole in Ivy Falls Avenue and broke the trip mechanism but was able to keep plowing snow. Cliff had to order parts to fix truck 304 from an outlet in Little Falls. A Blaine Public Works employee was there and offered to bring the parts back for us, saving us a long trip to Little Falls. John repaired the broken trip mechanism, and the truck is now ready for the next snowfall. Engineering Lemay Lake Road Reconstruction - Design of the project continues. Staff is currently working on the storm sewer design and road sections. A second informational meeting for area residents and property owners is anticipated during the first half of March. Final plans are anticipated sometime in April. Marie Avenue Rehabilitation - Staff submitted the preliminary plans and specifications to MnDOT. Review will likely take a couple of weeks. Once comments are received, production of the final plans can begin. Final plans are anticipated by mid to late March. Diane Road Neighborhood/Mendota Heights Road Rehabilitation - Staff submitted preliminary plans to MnDOT for review. Review is expected to take a couple of weeks. Once comments are received, production of final plans will begin. MnDOT review is only required for the Mendota Heights Road portion of the project. Final plans are anticipated by late March. Lower Mississippi River Watershed Management Organization (LMRWMO) - Staff attended a Technical Advisory Committee (TAC) meeting on Thursday. Mendota Heights hosted the meeting. The TAC was formed by the LMRWNO Board to make recommendations on a water quality cost sharing policy for drainages that cross municipal boundaries within the LMRWMO. The TAC, recommendation will ultimately be heard and voted on by the LMRWMO Board and incorporated into the next iteration of the Joint Powers Agreement that all member Cities agree to. Rogers Lake Property Owners Association - Staff attended the monthly meeting of the homeowners association on Thursday night. The association has filed for 501c(3) status and is drafting their bylaws. They are anticipating presenting to City Council at the March 6th meeting to introduce the association and to inform Council of their goals. Their next meeting is scheduled for March 22nd. Traffic Safety Committee (TSC) - The TSC met on Tuesday night before the City Council Meeting. Three resident requested issues and two internal issues were discussed. A summary of TSC recommendations will be presented at the March 6th Council meeting. MnDOT & Dakota County Projects The following projects are under the direction of MnDOT and Dakota County. They are presented as information only. For more information on MnDOT projects contact J.P. Gillach (651-234-7503, james.gillach@state.mn.us). Highway 13 Resurfacing (MnDOT) - The Resurfacing of Highway 13, along with drainage improvements and ADA upgrades between I-35W and Annapolis Street (Burnsville to West St. Paul) is on schedule for the summer of 2012. Drainage improvements at the Ivy Falls Bridge are included in the project. Construction should be anticipated between May and October of 2012, but MnDOT is planning on completing the work in segments. MnDOT plans to contact impacted Mendota Heights' residents with construction schedule news and road closure information. Detours around the construction areas will be provided. The portion of Highway 13 from Mendota to I-35E will be exempted from this project and reconstructed in 2015 under a separate MnDOT project. Highway 110 Resurfacing (MnDOT) - A small portion of Highway 110 will be resurfaced during the summer of 2012. From Lexington Avenue east to the I -35E bridge, along with spot repairs between Lexington and Highway 13 will be addressed as part of this project. MnDOT is working with Dakota County to minimize conflicts with their Lexington Avenue project (see below), also scheduled for the summer of 2012. Turnback of Old Sibley Memorial Highway (MnOOT) - MnDOT has stated their intent to vacate the Right -of -Way for the Old- Sibley Memorial Highway. Concept plans are being developed for the land use once it is vacated. The next meeting is scheduled for April 20th at Camp Sacagawea in Apple Valley.. Concept plans for the right-of-way will be discussed.. Lexington Avenue Resurfacing (County) - Dakota County will be resurfacing Lexington Avenue from Highway 110 south to Mendota Heights Road in 2012. This is strictly a pavement replacement project and will not modify the road section or expand the width of the roadway. Dakota County is working with MnDOT to minimize conflicts with their Highway 110 project, also scheduled for the summer of 2012. For more information contact the Dakota County Transportation Department at 952-891-7100.