Pipeline 04 06 2012. N E W S The Pipeline
LETTER
Public Works
En
April •6, 2012 gineering
code Enforcement
Public Works
The Parks Crew striped the soccer, lacrosse, and foul lines on the ball fields.
Grass was cut and the ball fields were dragged. Water meters were
installed at Mendakota Park and Kensington South Park. The buildings were
stocked with cleaning supplies for the summer. The water was turned on,
and all bathrooms were cleaned and opened for the season. Several people
attended weather safety training meeting.
The Utilities Crew cut roots and cleaned the sanitary sewer lines in Hingham
Court,, Annapolis Street, Chippewa Avenue, Fremont Avenue,, Highway 13.,
London Road, Eagle Ridge Drive easement, Glen Toro easement, Callahan
Drive, Warrior Drive easement, Knob Road, North Freeway Road., South
Freeway Road, and Mendota Heights Road. Near Friendly Hills Middle
School a lot of grease was found. Topsoil and grass seed were put down at
the Veronica lift station where buckthorn was removed last fall. Shrubs
were also planted at the Veronica lift station. A sanitary sewer inspection
was completed on Hidden Creek Trail.
The Streets Crew installed the hotbox on truck 303. Pothole repair was
done on Hunter Lane, Hunter Court, Orchard Place, Victoria Curve, and Twin
Circle Drive.
Lemay Lake Road Reconstruction - Final plans are being completed. We are
proposing a narrower than normal cul-de-sac design to address some
resident concerns and to accommodate the existing right-of-way limits. A
second informational meeting for residents and property owners is
scheduled for April 18th at City Hall. Final plans are anticipated in May.
Marie Avenue Rehabilitation - Final plans were approved along with
authorization to bid the project at the April 3rd Council meeting. Bid opening
will be April 25th at 10:00a.m. Bid award will be on the May 1st Council
agenda. The striping plan has been posted on the project page at the City's
web site and notification has been sent to the Marie Avenue residents with
the web link included.
Diane Road Neighborhood/Mendota Heights Road Rehabilitation - These
projects are advertised. Bid opening for both of these projects will be April
11th. The two projects are being bid together as one contract. Bid award
will be on the May 1st Council agenda.
White Pine Senior Living PUD Amendment Application - The applicant
submitted the necessary stormwater modeling calculations and the PUD Plan
Set Amendment was granted on Monday. The next step will be for Mendota
Mall Associates to apply for consent to transfer ownership of Lot 6, and then
apply for the Building Permit for the new facility. Both the consent to
transfer and the Building Permit will require Council approval.
Dodd Road/Highway 110 Intersection Pedestrian Improvements - Staff
received three proposals for the design and construction administration
work to improve pedestrian safety at the intersection of Dodd Road and
Highway 110. Staff and the MnDOT Metor South Area Engineer have
reviewed the proposals and a recommendation for consultant selection and
contract approval is scheduled for the April 17th Council agenda.
Construction of the improvements is scheduled for the summer of 2013.
Joint Right -of -Way Permitting - Dakota County has set up a right-of-way
permitting web site and database for cities willing to participate. Staff has
been involved in the preliminary discussions about the programs setup, but
Mendota Heights has not yet agreed to be a participant in the program. It is
likely that a formal request from the County for Mendota Heights to join the
joint program will be coming before Council in the near future.
Dakota County Capital Improvements Plan (CIP) - Dakota County is
reviewing their 2013-2017 Capital Improvement Program. The current
2012-2016 CIP is available through the County web page for review. Any
requests for County projects to be included in the new CIP can be made
through City Staff by June 13th so Council can review and formally submit
requests to the County by the June 25th deadline.
MT• ZFTKUM VA'. 9 .
The following projects are under the direction of MnDOT and Dakota County.
They are presented as information only. For more information on MnDOT
projects contact J.P. Gillach (651-234-7503, james.gillachOstate.mn.0
Highway 13 Resurfacing (MnDOT) - The resurfacing of Highway 13, along
with drainage improvements and ADA upgrades between I -35W an
Annapolis Street (Burnsville to West St. Paul) is scheduled for the summer
of 2012. The portion of Highway 13 from 2nd Street in Mendota to .I -35E in
Lilydale will be exempted from this project and reconstructed in 2015 under
a separate MnDOT project. An article posted at mendotaheights. patch. com
originally displayed an incorrect map that was supplied by MnDOT. MnDOT
has corrected the map and the mendotaheig hts. patch. com article has been
modified.
Highway 110 Resurfacing (MnDOT) - A small portion of Highway 110 from
Lexington Avenue east to the I -35E Bridge, along with spot repairs between
Lexington ngton and Highway 13 will be resurfaced during the summer of 2012.
MnDOT is working with Dakota County to minimize conflicts with their
Lexington Avenue project (see below), also scheduled for 2012.
Turnback of Old Sibley Memorial Highway (MnDOT) - MnDOT intends to
vacate the Right -of -Way for the Old Sibley Memorial Highway. Concept
plans are being developed for the land use once it is vacated. The next
meeting is scheduled for April 20th at Camp Sacagawea in Apple Valley. City
Council did approve a letter to be sent to our State legislative delegation
outlining concerns about the proposal from a City perspective. MnDOT will
be contacting the two Mendota Heights businesses impacted by the proposal
prior to the April meeting.
Lexington Avenue Resurfacing (County) - Dakota County will be resurfacing
Lexington Avenue from just north of Highway 110 (Vail Drive) south to
Mendota Heights Road in 2012. Dakota County is working with MnDOT to
minimize conflicts with their Highway 110 project, also scheduled for the
summer of 2012.. For more information contact the Dakota County
Transportation Department at 952-891-7100.