Pipeline 04 20 2012L E T T E R Public Works Engineering Code Enforcement April 20, 2012 The Parks Crew cut grass, dragged baseball diamonds and striped the ball fields. Flat tires were repaired on xmark and chalker. They Met with MHAA about summer baseball maintenance. A training session on new Kubota mower was held by the dealer. Downed trees from excessive winds were cleared up from the parks. The Streets Crew made up new sign for Knollwood Lane and Knollwood Court. Black top patching was done on Brookside Lane in advance of a seal coating project. Large pot holes were also filled on Diane Road,, Celia Drive and began some filling on Douglas road and Victoria. Landscape rocks were pushed back on Summit Lane to prepare the site for stump grinding. No parking signs were replaced on Warrior Drive. Storm pipe outlet was excavated at Par 3 due to the sediment in the pond creating a backup on Bachelor Avenue. Rich checked lift stations daily and repainted the panel at the Lilydale lift station to cover graffiti. Rich also assisted the street crew with the removal of the rock on Summit Lane as well .as the storm sewer maintenance at Par 3. The sprayer was read.ied for broad leaf weed control for the city parks. The Large sump Manhole was cleaned out on Swan Drive. A sewer repair at 1901 Warrior Drive was inspected. PM M-T�W Lemay Lake Road Reconstruction - Final plans are being completed. Staff held an informational meeting with residents affected by the project on Wednesday. The meeting was well attended with no significant issue issues raised by the neighborhood. Final plans are anticipated in May. Marie Avenue Rehabilitation .- Bid opening will be April 25th at 10:00am. Bid award will be on the May 1't Council agenda. The striping plan has been posted on the project page at the City's web site and notification has been sent to the Marie Avenue residents with the web link included. Diane Road Neighborhood/Mendota Heights Road Rehabilitation - McNamara Contracting is anticipating a May 2nd start date for the project. There is a preconstruction meeting planned for April 27th. Staff will mail a notice to the residents once a tentative schedule is submitted by the contractor. White Pine Senior Living PUD Amendment Application '- The applicant submitted the necessary storm water modeling calculations and the PUD Plan Set Amendment was granted. The next step will be for Mendota Mail Associates to apply for consent to transfer ownership of Lot 6, and then apply for Building Permit for the new facility. Both the consent to transfer and the Building Permit will require Council approval. Dodd Road/Highway 110 Intersection Pedestrian Improvements - City Council awarded the design contract to SRF Consulting Group at their April 17th meeting. Design will take place throughout the summer of 2012. Construction is planned for 2013. Dakota County Capital Improvements Plan (CIP) - Dakota County is reviewing their 2013-2017 Capital Improvement Program. The current 2012-2016 CIP is available through the County web page for review. Any requests for County projects to be included in the new CIP can be made through City Staff by June 13th so Council can review and formally submit requests to the County by the June 25th deadline. Staff requested projects will be discussed at the May 1st Council meeting. Lower Mississippi River Watershed Management Organization (LMRWMO) - Staff attended the monthly meeting of the LMRWMO on Thursday. Revisions to the South Saint Paul Stormwater Management Plan were approved, and an agreement with MPCA to monitor four lakes in the LMRWMO (including Rogers Lake) was approved. The following projects are under the direction of MnDOT and Dakota County. They are presented as information only. For more information on MnDOT projects contact J.P. Gillach (651-234-7503, james.gillach@state.mn.us). Highway 13 Resurfacing (MnDOT) - The Resurfacing of Highway 13, along with drainage improvements and ADA upgrades between I -35W and Annapolis Street (Burnsville to West St. Paul) is scheduled for the summer of 2012. The portion of Highway 13 from 2nd Street in Mendota to I -35E in Lilydale will be exempted from this project and reconstructed in 2015 under a separate MnDOT project. The preconstruction meeting is scheduled for Tuesday (4/24) at the Mendota Heights MnDOT facility. Highway 110 Resurfacing (MnDOT) - A small portion of Highway 110 from Lexington Avenue east to the I -35E Bridge, along with spot repairs between Lexington and Highway 13 will be resurfaced during the summer of 2012. Construction is scheduled to begin on April 30th. The access ramp to/from northbound I -35E is included in the project. Turnback of Old Sibley Memorial Highway (MnDOT) - MnDOT intends to vacate the Right -of -Way for the Old Sibley Memorial Highway. Concept plans and alternatives are being developed for the land use once it is vacated. Staff attended a meeting of the working group at Lebanon Hills Regional Park on Friday. City Council did approve a letter to be sent to our State legislative delegation outlining their concerns about the proposal. MnDOT will be contacting two Mendota Heights businesses impacted by the proposal prior to the April meeting. Once alternatives are developed, public meetings are anticipated. Lexington Avenue Resurfacing (County) - Dakota County will be resurfacing Lexington Avenue from just north of Highway 110 (Vail Drive) south to Mendota Heights Road in 2012. Dakota County is working with MnDOT to minimize conflicts with their Highway 110 project, also scheduled for the summer of 2012. For more information contact the Dakota County Transportation Department at 952-891-7100.