The Pipeline
April 23, 2012
The Parks Crew hung the batting cage netting at Mendakota Park. They
also dragged all the ball fields and installed bases at Mendakota Park and
the Civic Center ball fields. Graffiti was painted over at Rogers Lake on the
skate park equipment.
The Utilities Crew applied root killing chemicals on Apache after cutting
roots. Roots were cut in the sanitary sewer lines on Kay Avenue, Walsh
Lane, Lilac Lane, Caren Road., the Caren easement; and the Victoria Court
easement near Lexington Avenue.
The Streets Crew took all plows, sanders, and wings off the plow trucks.
The trucks are now ready for the spring street sweeping, which will be
starting on Monday, March 26th. New blades were put on the chippers, and
curbing damaged from snow plowing was repaired.
Engineering
Lemay Lake Road Reconstruction - Staff is completing the road section
design, and the storm drainage calculations. We are proposing a narrower
than normal cul-de-sac design to address some resident concerns. A
second informational meeting for area residents and property owners is
anticipated in April. Final plans are anticipated in May.
Marie Avenue Rehabilitation - Once comments are received from MnDOT,
staff will complete the design plans and bring to Council for approval and
authorization to bid. Final plans are anticipated by late March. The striping
plan will be mailed to Marie Avenue residents once completed.
Diane Road Neighborhood/Mendota Heights Road Rehabilitation - Council
approved the final plans and authorized advertisement for bid at the March
20th Council meeting. Bid opening is scheduled for April lith at 10: 00am,
and contract award is anticipated to be on the April 17th council agenda.
White Pine Senior Living PUD Amendment Application- The final PUD Plan
Set Amendment package was delivered to City Staff today (3/23/12). Staff
will analyze the application package for compliance with City Code and the
terms of the settlement agreement with Mendota Mail Associates, LLC. A
response to the final PUD Plan Set Amendment is anticipated next week.
Dodd Road/Highway 110 Intersection Pedestrian Improvements - Staff
received three proposals for the design and construction administration
work to improve pedestrian safety at the intersection of Dodd Road and
Highway 110. Staff will review and score the proposals and make a
recommendation to Council at their April 3rd meeting. Construction of the
improvements is scheduled for the summer of 2013.
Gun Club Lake Wantershed Management Organization (GCLWMO) - Staff
attended the Quarterly meeting of the GCLWMO on Wednesday with the
City's newly appointed citizen representative, John Molinaro, and alternate
representative Don Mockenhaupt. The board voted to approve a minor
update to their Watershed Management Plan which is being mandated by
the Board of Water and Soil Resources (BWSR). The board meets again in
June at which time they will consider options of dissolving and merging with
adjacent WMO's or continuing on as an independent entity.
Robert Street Transitway Alternatives Analysis Study (RSTAAS) - Staff
attended the Technical Advisory Committee (TAC) meeting last week and
the Steering Committee on Thursday of this past week. Mayor Krebsbach
also attended the Steering Committee meeting. The TAC recently reviewed
proposals from consultant teams for production of the Alternatives Analysis.
MnDOT, Dakota County, and Ramsey County are looking for potential
improvements to public transit in the Robert Street Corridor. The consultant
team recommended by the TAC was approved by the steering committee
and the project timeline was discussed. Final recommendations are
anticipated in the Spring of 2014.
The following projects are under the direction of MnDOT and Dakota County.
They are presented as information only. For more information on MnDOT
projects contact J.P. Gillach (651-234-7503, james.gillachccostate.mn.us).
Highway 13 Resurfacing (MnDOT) - The Resurfacing of Highway 13, along
with drainage improvements and ADA upgrades between I -35W and
Annapolis Street (Burnsville to West St. Paul) is scheduled for the summer
of 2012. The portion of Highway 13 from 2nd Street in Mendota to I -35E in
Lilydale will be exempted from this project and reconstructed in 2015 under
a separate MnDOT project.
Highway 110 Resurfacing (MnDOT) - A small portion of Highway 110 from
Lexington Avenue east to the I -35E Bridge,, along with spot repairs between
Lexington and Highway 13 will be resurfaced during the summer of 2012.
MnDOT is working with Dakota County to minimize conflicts with their
Lexington Avenue project (see below), also scheduled for 2012.
Turnback of Old Sibley Memorial Highway (MnDOT) - MnDOT intends to
vacate the Right -of -Way for the Old Sibley Memorial Highway. Concept
plans are being developed for the land use once it is vacated. The next
meeting is scheduled for April 20th at Camp Sacagawea in Apple Valley.
MnDOT will be contacting the two Mendota Heights businesses impacted by
the proposal prior to the April meeting.
Lexington Avenue Resurfacing (County) - Dakota County will be resurfacing
Lexington Avenue from Highway 110 south to Mendota Heights Road in'
2012. No expansion of Lexington Avenue is being included with this project.
Dakota County is working with MnDOT to minimize conflicts with their
Highway 110 project, also scheduled for the summer of 2012. For more
information contact the Dakota County Transportation Department at 952-
891-7100.