Pipeline 01 13 201211amn E W S The Pipeline
L E T T E R
Public Works
Engineering
code Enforcement January 13, 2012
The Parks Crew resumed flooding of the ice rinks on Wednesday. They
repaired unit #505, serviced it and changed the fuel filter. The trucks were
washed. The tool box on truck #503 was repaired.
The Utilities Crew exercised the generator at the Mendota Heights Road lift
station. The sanitary sewer line was checked downstream of Mendakota
Golf Course for grease. The line looked clear of grease. There was an
alarm on Tuesday at 3:40 pm at the Mendota Heights Road lift station.
Pump 2 had a loose wire. Pump is now back in service.
The Streets Crew took the old cutting edge off the grapple bucket on the
bobcat and replaced it with a new one. They attended the safety meeting in
West St. Paul. Maintenance was done on all the chain saws., Rods were cut
for s . treets signs. House cleaning was done in the back shop.
Engineering
Lemay Lake Road Reconstruction - Staff has begun designing the project
and anticipates holding a second informational meeting in February. We
received a request from a neighborhood resident to include a separated trail
as part of the project. Staff is analyzing the possibility.
Marie Avenue Rehabilitation - Staff is creating the base file for the proposed
design. The initial submittal to MnDOT is projected to be in late January.
Diane Road Neighborhood/Mendota Heights Road Rehabilitation - Staff has
started to develop plans and specifications. Staff anticipates submitting the
project to MnDOT for review in late January. MnDOT review is only required
for the Mendota Heights Road portion of the project.
City Hall Carpet Installation - Installation of new carpet continues at City
Hall. Completed last week were Tamara Schutta's office, the reception area,
and the Code Enforcement/Fire Marshall office. This week, furniture was
moved in the engineering area for installation on Monday.
OSHA Training - Engineering staff attended the mandatory annual OSHA
training at West Saint Paul City Hall on Wednesday.
American Public Works Association (APWA) Conference Committee - John
attended the committee meeting where members identify the theme and
plan for topics to be discussed at the two APWA conferences held per year.
The Spring Conference was discussed at Thursday's meeting.
Rogers Lake Shoreland Homeowners Association - John attended the first
meeting of the shoreland home owners association last week, Thursday. Of
the 23 private property owners, 7 attended the first association meeting.
Those in attendance plan on recruiting more members. Association
members talked about proposing a partnership with the City for weed
control in Rogers Lake.
[am INT011 F-Xqum VA UT"I - -
The following projects are under the management and supervision of
MnDOT and Dakota County. They are presented as information only. For
more information on MnDOT projects contact J.P. Gillach at MnDOT (651-
234-7503, James cl i I lach @state. m..n. us).
Highway 13 Resurfacing (MnDOT). - A project for resurfacing,. drainage
improvements and ADA upgrades to Highway 13 between I -35W and
Annapolis Street (Burnsville to West St. Paul) is scheduled for 2012.
Construction should be anticipated from May 2012 to October 2012.
Highway 110 Resurfacing (MnDOT) - A small portion of Highway 110 will be
resurfaced in 2012. The se . ction from Lexington Avenue east to the I -35E
bridge,, along with spot repairs between Lexington and Highway 13 will be
addressed as part of this project.
Lexington Avenue Resurfacing (County) - Dakota County will be resurfacing
Lexington Avenue from Highway 110 south to Mendota Heights Road in
2012. This is strictly a pavement replacement project and will not expand
the width of the roadway. Dakota County and MnDOT are attempting to
schedule their respective projects around Lexington and Highway 110 to not
interfere with one another, and to minimize inconvenience to travelers. For
more information contact the Dakota County Transportation Department at
952-891-7100.