January 20, 2012
The Parks Crew continue to flood the skating rinks. They are broomed off
as needed. Boards were picked up to make repairs to picnic tables as
needed. Repairs were made to truck 503. The trucks were washed.
Rich and Tom attended the annual Collection System Operators Conference
put on the by the Minnesota Pollution Control Agency. This seminar is
required to keep their operator's license current.
Streets crews could not provide a report for this week as they were out
salting and plowing streets on Friday.
Engineering
Lemay I Lake Road Reconstruction - Design of the project is underway. Staff
anticipates holding a second informational meeting for residents and
property owners in February.
Marie Avenue Rehabilitation - Staff is preparing the initial submittal to
MnDOT. We anticipate that submittal to be made in late January.
Diane Road Neighborhood/Mendota Heights Road. Rehabilitation. - Staff is
developing plans and specifications. Staff anticipates submitting the project
to MnDOT for review in late January. MnDOT review is only required for the
Mendota Heights Road portion of the project.
City Hall Carpet Installation - Installation of new carpet continues at City
Hall. Completed last week was the engineering area. Remaining areas
(Ryan's, John's, & Stacy's offices along with the small conference room and
back hallway) are scheduled for February 2nd & 3rd.
New Administrator Geta Tour of Public Works - Justin took a tour of the
Public Works facility on Tuesday morning. He met with the crews and
discussed past successes and upcoming challenges with them. John
accompanied Justin on the tour.
Lower Mississippi River Watershed Management Organization - John
attended the monthly LMRWMO meeting at South Saint Paul City Hall on
Thursday with City Board Representative Mary Jeanne Schneeman. At the
meeting, the LMRWMO adopted a general fund balance policy as
recommended by their auditor, and established the first year of the
LMRWMO Lake Monitoring Program. This is a new product of the LMRWMO
as it was an addition to the recently approved Watershed Management Plan
for the organization. As part of the Lake Monitoring Program, Cities
currently participating in the Citizen -Assisted Monitoring Program (CAMP)
through the Metropolitan Council would be eligible for reimbursement of
their CAMP fees from the LMRWMO. Mendota Heights currently participates
in the CAMP, and is now eligible to get their fees reimbursed.
Noise Oversight Committee (NOC) - John attended the NOC meeting at the
Metropolitan Airports Commission (MAC) facility on Wednesday as no
members of the Airport Relations Commission were able to attend. The
recommendation of the preferred alternative defined in the Environmental
Assessment for the MSP Long -Range Comprehensive Plan was subject of
much debate. NOC voted to recommend the preferred alternative with only
the, City of Minneapolis dissenting. After public meetings, the
recommendation Will be heard by the MAC board.
Airport Relations Commission (ARC) - John attended the ARC meeting
Wednesday night. There was not an official quorum at the meeting so no
official actions were taken. The ARC did review the monthly reports along
with noise and airport traffic data, and they welcomed Paul Portz as their
newest Commissioner. City Administrator Justin Miller will be assuming the
duties of staff liaison for the ARC starting in February.
White Pine Senior Living (Mendota Plaza) - Representatives from White Pine
Senior Living contacted staff this week to set up a meeting on January 26th
to go through their modifications and additions to the PUD Amendment
plans for their facility. Last month their preliminary plans were submitted
and commented on by staff. Once all the issues have been addressed in the
plans, the PUD amendment can be approved by staff as noted in the civil
suit settlement agreement.
W_MRMr - 0 11 .
The following projects are under the management and supervision of
MnDOT and Dakota County. They are presented as information only. For
more. information on MnDOT projects contact J.P. Gillach at MnDOT (651-
234-7503, James.gillach0state.mn.us).
Highway 13 Resurfacing (MnDOT) - A project for resurfacing, drainage
improvements and ADA upgrades to Highway 13 between I -35W and
Annapolis Street (Burnsville to West St. Paul) is scheduled for 2012.
Construction should be anticipated from May 2012 to October 2012.
Highway 110 Resurfacing (MnDOT) - A small portion of Highway 110 will be
resurfaced in 2012. The section from Lexington Avenue east to the I -35E
bridge, along with spot repairs between Lexington and Highway 13 will be
addressed as part of this project.
Turnback of Old Sibley Memorial Highway (MnDOT) - Concept plans are
being developed by State agencies for the land use once the roadway is
removed. Meetings are being scheduled for the end of March timeframe to
go over the concepts. Mendota Heights. will be hosting these meetings.
Lexington Avenue Resurfacing
. (County) - Dakota County will be resurfacing
Lexington Avenue from Highway 110 south to Mendota Heights Road in
2012. This is strictly a pavement replacement project and will not expand
the width of the roadway. Dakota County and MnDOT are attempting to
schedule their respective projects around Lexington and Highway 110 to not
interfere with one another, and to minimize inconvenience to travelers. For
more information contact the Dakota County Transportation Department at
952-891-7100.