Loading...
Pipeline 01 27 2012IN E W S The Pipeline L E T T E R Public Works Engineering January 27, 2012 Code Enforcement MTMBqK= The Parks Department repaired the ice rinks at Ivy Falls Park, Marie Park and Friendly Hills Park. There was snow in the air pockets and water was applied to fix the air pockets. They plowed the cul-de-sacs, rinks, pedways and parking lots. The aerator was started in Rogers Lake. They 'attended a seminar at Scharber & Sons in Rogers. The seminar was on the new laws for. commercial driver license holders. The Utilities Crew replaced old and broken hydrant flags on Delaware Avenue, Huber Drive and Park Lane and assisted Streets by plowing the cul- de-sacs, middle area of the city, and lift station parking lots. The bathroom partition wall at Public Works was replaced with a new one. The Street Crew salted all streets after a light snow on January 20th. All streets were salted and plowed after the freezing rain on January 22nd. They started early on January 23rd by salting and plowing the streets after a 1 :Y4" snow fall. John Ambrose did some welding on the parks pickup plow. He also made pins for the wing plow truck box. A transmission leak was found in truck 304. It was repaired before any major damage occurred. A valve control box on truck 312 was painted. I Lemay Lake Road Reconstruction - Staff is designing the project. A second informational meeting for residents and property owners in anticipated around the third week in February. Marie Avenue Rehabilitation - Staff is preparing the MnDOT initial submittal.. We anticipate that submittal to be made late next week. Diane Road Neighborhood/Mendota Heights Road Rehabilitation - Staff is preparing plans and specifications, and working out the details of the intersection modification at MHR and Dodd Road to accommodate the new right turn lane. Initial submittal for MnDOT review is anticipated by the end of next week. MnDOT review is only required for the Mendota Heights Road portion of the project. City Hall Carpet Installation - Carpet installation continues at City Hall. The final areas to receive new carpet (Ryan's, John's, & Stacy's offices along with the small conference room and back hallway) are scheduled for February 2nd & 3rd Dakota County Joint Right -of -Way Permitting Meeting - Ryan and Bobby attended a meeting on Thursday about the potential for consolidating Right - of -Way permitting among Dakota County Cities. The proposal is in the very early stages, and not many details are known at this point. City staff is not committing to any type of participation in the program unless there will be an advantage to do so. If the program moves forward, and Council chooses to participate, a Joint Powers Agreement would be needed. Rogers Lake Property Owners Association - John attended a meeting of the proposed association on Thursday evening. The association is working on drafting by-laws, and discussing dues level for members. The association plans to meet monthly to discuss issues pertaining to Rogers Lake. White hite Pine Senior Living (Mendota Plaza) - Representatives from White Pine Senior Living brought their modified plans into City Hall on Thursday to review with staff. This past December, John reviewed the preliminary PUD amendment plans and provided comments. The modified plans address about 80% of the comments, and the remaining issues were discussed and further changes to the plans are anticipated within the next two weeks. [LM eliels m 11T.1,T11,F.XK-9Trffi im The following projects are under the management and supervision of MnDOT and Dakota County. They are presented as information only. For more information on MnDOT projects contact J.P. Gillach at MnDOT (651- 234-7503, -james.gillach@state.mn.us). Highway 13 Resurfacing (MnDOT) - A project for resurfacing, drainage improvements and ADA upgrades to Highway 13 between I -35W and Annapolis Street (Burnsville to West St. Paul) is scheduled for 2012. Construction should be anticipated from May 2012 to October 2012. MnDOT plans to contact impacted Mendota Heights' residents with construction news and road closure information. Detours around the construction areas will be provided. Highway 110 Resurfacing (MnDOT) - A small portion of Highway 110 will be resurfaced in 2012. The section from Lexington Avenue east to the I -35E bridge, along with spot repairs between Lexington and Highway 13 will be addressed as part of this project. MnDOT is working with Dakota County to minimize, conflicts with their Lexington Avenue project (see below), also scheduled for the summer of 2012. Turnback of Old Sibley Memorial Highway (MnDOT) - MnDOT has stated their intent to vacate the Right -of -Way for the Old Sibley Memorial Highway. Concept plans are being developed for the land use once it is vacated. Meetings are being scheduled for the end of March timeframe to go over the concept plans. Meetings will be held at Mendota Heights City Hall. Lexington Avenue Resurfacing (County) - Dakota County will be resurfacing Lexington Avenue. from Highway 110 south to Mendota Heights Road in 2012. This is strictly a pavement replacement project and will not modify the road section or expand the width of the roadway. Dakota County is working with MnDOT to minimize conflicts with their Highway 110 project, also scheduled for the summer of 2012. For more information contact the Dakota County Transportation Department at 952-891-7100.