Loading...
Pipeline 02 10 2012The Parks Crew flooded skating rinks and reopened warming houses. Trees were trimmed in the parks, and the brush was hauled away and chipped. Picnic table repairing continues, and a tool box was installed on truck 503. The Utilities Crew checked all the lift station pumps and storm lift stations for pump voltage variances. Tree roots were cut and root killing chemicals were applied in the sanitary sewer line on Williams Court. The Streets Crew picked up truck 308 from Mack in Roseville. The truck had a new rear axle and differential installed. A new fuel tank step was installed in truck 308. Brush was hauled away from the back of the shop to the dump where it will be chipped. Engineering Lemay Lake Road Reconstruction - Staff is designing the project. A second i informational meeting for area residents and property owners n anticipated during the first half of March. Marie Avenue Rehabilitation - Staff will be submitting the preliminary plans and specifications to MnDOT for review early next week. Diane Road Neighborhood/Mendota Heights Road Rehabilitation - Staff has completed preliminary plans and specifications, initial submittal to MnDOT for review was made on Thursday. MnDOT review is only required for the Mendota Heights Road portion of the project. City Hall Carpet Installation - The back offices now have new carpet. The reception area and small conference room are also re -carpeted. Staff is reviewing available 2012 budget funds and determining the next area to receive new flooring. WhitePine SeniorLiving(Mendota Plazas - Staff is continuing discussions with t . he developer on finalizing their PUD Amendment application. By terms of the Settlement Agreement, the PUD Amendment is to be approved at staff level. Consent to Transfer Ownership and I Building Permit approval remains at the City Council level. Dakota County Emergency Management Table -Top Exercise- The Public Works Director attended the annual Emergency Management exercise at Inver Grove Heights City Hall on Wednesday morning. The exercised covered response and resource allocation should a natural disaster occur in northern Dakota County. Inver Grove Heights, South Saint Paul, West Saint Paul, and Mendota Heights participated. rum, 1kT*11dF,-1q-qT,1FV= •I The following projects are under the direction of MnDOT and Dakota County. They are presented as information only. For more information on MnDOT projects contact J.P. Gillach (651-234-7503, james..qillach@,state.mn.us). Highway 13 Resurfacing (MnDOT) - The resurfacing of Highway hway 13f along with drainage improvements and ADA upgrades between I -35W and Annapolis Street (Burnsville to West St. Paul) is on schedule for the summer of 2012. Construction should be anticipated between May and October of 2012, but MnDOT is planning on completing the work in segments. MnDOT plans to contact impacted Mendota Heights' residents with construction schedule news and road closure information. Detours around the construction areas will be provided. Highway 110 Resurfacing (MnDOT). - A small portion of Highway 110 will be resurfaced during the summer of 2012. From Lexington Avenue east to the I -35E bridge, along with spot repairs between Lexington and Highway 13 will be addressed as part of this project. MnDOT is working with Dakota County to minimize conflicts with their Lexington Avenue project (see below), also scheduled for the summer of 2012. Turnback of Old Sibley Memorial Highway (MnDOT) - MnDOT has stated their intent to vacate the Right -of -Way for the Old Sibley Memorial Highway. Concept plans are being developed for the land use once it is vacated. Meetings are being scheduled for the end of March timeframe to go over the concept plans. Mendota Heights has offered to host the project meetings. Lexington Avenue Resurfacing (County) - Dakota County will be resurfacing Lexington Avenue from Highway 110 south to Mendota Heights Road in 2012. This is strictly a pavement replacement project and will not modify the road section or expand the width of the roadway. Dakota County is working with MnDOT to minimize conflicts with their Highway 110 project, also scheduled for the ,summer of 2012. For more information contact the Dakota County Transportation Department at 952-891-7100.