Pipeline 10 28 2011N E W S 0
The Pipe in
LETTER
Public Works 4
Engineerina
October 28, 2011
Code Enforcement`'
Public Works
The Parks Crew hauled brush and tree limbs to the bonfire site. They
finished winterizing the buildings at Kensington and Mendakota Parks. A
broken swing was replaced at Mendakota Park.
The Utility Crew applied rootx in the three manholes on Marie Avenue. Tree
roots were cut and rootx applied in the sanitary sewer lines on Caren Road.
The control panel at the Veronica lift station was painted.
The Streets Crew pushed up.the brush pile at the bonfire site two or three
times a day. Welding was done on the hose bracket on truck #304. They
tore out the street on Lemay Lake so curbing could be replaced.
E n g 11 n egri-n-9
Wagon Wheel Trail Reconstruction - The contractor is continuing to
complete the grading of the boulevard areas with top soil and placing sod.
Traffic signs are currently being manufactured and should be installed within
next week. The contractor has also begun reinstalling mailboxes. Cul-de-
sacs were paved with the final lift of bituminous on Thursday.
2012 Projec - Staff held an informational meeting for the Lemay Lake
Improvement Project. The public hearing is scheduled for November 15,
2011.
Highway 55/Mendota Heights Road - MnDOT is having the city revise the
layout of the pedestrian ramps to improve safety. The contractor removed
the old ramps and installed new ones on Thursday. The bituminous will be
patched next week.
LilyDale Housin-, Project - The contractor for the Lilydale project is installing
water main in Valley Park to service the new building. Construction of the
water main should take approximately two weeks.
MnDOT Pro le—cts
The following projects are under the management and supervision of
MnDOT and are presented as information only. Contacts for each individual
project are listed after the project update.
I -35E Resurfacing - MnDOT began resurfacing I -35E on August 18th. The
project is anticipated to last until November 1st. In addition to the
pavement resurfacing, MnDOT will be installing new guardrails, improving
drainage, and upgrading exit and entrance ramp signals. The project will be
accomplished mainly at night and during off-peak (non -rush hour) traffic
times. Lane closures are expected during off-peak traffic times.
Information on the project can be found at the MnDOT project web page:
http://www.dot.state.m.n.us/metro/"projects/`i35eeagan/index.h.tmI
I -35E & Highway 13 Traffic Signal Installation - Traffic signals at the exit
and entrance ramps to I -35E from Highway 13 will begin on approximately
September 15th. Information about the can be found on the MnDOT project
web page: http://www.dot.state..mn.usl,metro/projects/hwy13,mendot