Pipeline 11 18 2011L E T T E
• Work
Engineering
CndeETforca-rrr
November 18, 2011
TlwnNspwrn�
The Parks Crew planted trees to replace dead ones at Hagstrorn King and
Kensington South Parks. The hockey rinks were leveled at Marie and
Wentworth Parks. A rotting fence was removed at Ivy Falls by the tennis
courts. Low areas were filled at Wentworth Park to build up the berm at Ivy
Falls general skating rink.
The Utilities Crew assisted the Streets Crew with black topping. A water box
was fixed on William Court. There was a high water alarm and power
outage at 8:00 p.m. on Tuesday at the Northland lift station. Power was
restored at 8:45 p.m. Newly planted trees were watered with the jet truck.
The Streets Crew finished the last of the black topping throughout the city
this week. Snow plows, wings, and sanders were mounted on trucks in
preparation for the snow season.
Wagon Wheel Trail Reconstruction - The project has been substantially
completed with only the final wear course and miscellaneous punch list
items remaining. Traffic signs have been installed and the centerline of
Wagon Wheel Trail has been striped.
Lemma Lake Road Reconstruction - The public hearing was opened at the
November 15th council meeting. The public hearing was continued until the
December 6th meeting to allow staff time to address concerns from the
neighborhood. The area is currently being surveyed by a third party
consultant.
Marie Avenue Rehabilitation - Staff has set up survey control points and has
begun gathering topography data for the project. The survey data will be
used to develop plans and specifications this winter.
Diane Road Neiahborhood Rehabilitation - Staff has started to develop plans
and specifications.
Knollwood Lane Rehabilitation - City council accepted the project and
approved the final payment to the contractor (this will start the one year
guarantee period).
Pond Analysis - City council authorized staff to enter into a contract with
Bonestroo/Stantec to assess the condition of three (3) ponds. The ponds
selected were Copperfield Pond, Burrows Pond and Park Place Pond.
Bonestroo/Stantec has assessed the ponds, completed their report, and
presented the results at the November 15th city council meeting.
Improvement Plans - Staff is in the process of updating the 2012-2016
Street Improvement Plan (SIP). Included in the new plan will be an outline
of chip seal projects. Staff is also preparing a Sanitary Sewer Improvement
Plan (SSIP). This plan is expected to be presented to city council in
December. Staff has also begun researching a Pond Improvement Plan and
Trail Improvement Plan. Once all plans are completed the will eventually
make up a City Wide Capital Improvement Plan (CIP).