Loading...
Pipeline 09 30 2011N E W S The Pipeline LETTER Public Works Engineering 6 ,� September 30, 2011 Code Enforcement Public Works The Parks Crew trimmed up the willow trees at Rogers Lake Park and hauled away the debris. The sprinkler heads were replaced around the playground equipment at Kensington Park after the new equipment was installed. The oil leak was repaired on the Kubota. Bases were removed from Mendakota Park and stored away for the winter. Trees were trimmed along the pedway on Marie Avenue. There was a force main break on Wednesday morning. The utility crew had it set up to bypass pumping within one hour of the break being reported. Valley Rich Company provided the dig to the break and it was fixed by 6:00 P.M. The break occurred where two pieces of 14" pipe meet in the bell connector. Valley Rich Company then cut out the bell section and put in a stainless steel band connecter. This is the third break on this forcemain in the last eight years. Tom, Rich and Andy were on this job. The phase monitor was replaced at the Lilydale lift station by Rich and Cliff. New hydrant flags were put on the fire hydrants in the business park. A manhole riser was installed at Dodd Road and Ashley Lane. A sanitary sewer inspection was done at 635 Wesley Lane for a spot repair. The Streets Crew fixed catch basins on Copperfield Drive and Park Place Drive. They worked on fixing the dump truck rear differentials. Engineering Wagon Wheel Trail Reconstruction - The contractor has requested to work on Saturday October 1St. The street grading is nearly complete and curb installation is scheduled for next Thursday (10/6). 2012 Reconstruction Projects - Staff has completed the feasibility report for the Lemay Lake Road Neighborhood Improvements. Public Hearings are scheduled for Tuesday October 4t" for Marie Avenue, Mendota Heights Road and the Diane Road Neighborhood Improvements. MnDOT Projects The following projects are under the management and supervision of MnDOT and are presented as information only. Contacts for each individual project are listed after the project update. I -35E Resurfacing - MnDOT began resurfacing I -35E on August 18th. The project is anticipated to last until November ist. In addition to the pavement resurfacing, MnDOT will be installing new guardrails, improving drainage, and upgrading exit and entrance ramp signals. The project will be accomplished mainly at night and during off-peak (non -rush hour) traffic times. Lane closures are expected during off-peak traffic times. Information on the project can be found at the MnDOT project web page: http://www.dot.state.mn.us/metro/projects/i35eeagan/index.htmI I -35E & Highway 13 Traffic Signal Installation - Traffic signals at the exit and entrance ramps to I -35E from Highway 13 will begin on approximately September 15th. Information about the project can be found on the MnDOT project web page: http://www.dot.state.mn.us/metro/projects/hwy13mendota/