Loading...
Pipeline 09 16 2011NEWS The Pipeline -'..)...LETTER Public Works ��'� ; ,4 Engineering .." Code Enforcement September 16, 2011 Public Works The Parks Crew removed a downed tree at Rogers Lake and at the Friendly Hills Archery Range. The hockey boards that were replaced were painted. They finished spraying the pedways for weeds. The vandalized pole for the tennis net was repaired at Friendly Hills Park. Trees were trimmed along the pedway at Marie Avenue and Lexington Avenue. The Utility Crew installed two new gfci outlets, bolted down two drill presses and secured the ladders on the walls in the public works garage, as directed by the safety committee. "Pot" was sprayed with total weed killer that is growing in Valley Park, as directed by the police. The Street Crew hauled in class #5 for the alley between Hiawatha Avenue and Freemont, potholes and low spots were filled. Black dirt and grass seed was put down on View Lane and Butler Avenue. Black dirt and grass seed was also put down at the end of Sprint Street, the berm was extended and a swale cut out. Engineering Wagon Wheel Trail Reconstruction - The sewer contractor is scheduled to be completed with the underground work on Monday(9/19). Curb was installed west of 35E, Swan Ct, Rogers Ct, and Alice Lane will have the curb sections replaced starting on Tuesday(9/20). Bituminous trail rehabilitation is scheduled to begin on Monday as well. The contractor has been making excellent progress. MnDOT Projects The following projects are under the management and supervision of MnDOT and are presented as information only. Contacts for each individual project are listed after the project update. I -35E Resurfacing - MnDOT began resurfacing I -35E on August 18th. The project is anticipated to last until November 1st. In addition to the pavement resurfacing, MnDOT will be installing new guardrails, improving drainage, and upgrading exit and entrance ramp signals. The project will be accomplished mainly at night and during off-peak (non -rush hour) traffic times. Lane closures are expected during off-peak traffic times. Information on the project can be found at the MnDOT project web page: http://www.dot.state.mn.us/metro/projects/i35eeagan/index.htmI I -35E & Highway 13 Traffic Signal Installation - Traffic signals at the exit and entrance ramps to I -35E from Highway 13 will begin on approximately September 15t". Information about the project on Highway 13 reconstruction projects can be found on the MnDOT project web page: http://www.dot.state.mn.us/metro/projects/hwy13mendota/