Pipeline 07 27 2011N E W S The Pipeline
L E T T E R�
Public Works �•
Engineerings
Code Enforcement A August 5, 2011
Public Works
The Parks Crew installed no dumping signs at the Copperfield and Huber
Drive trail. Trees were trimmed at Mendakota Park along the pedway. The
skating rink blacktop was painted at Friendly Hills Park. The facet handle
was repaired in the men's room at Mendakota Park. A dead oak tree in
Friendly Hills Park was cut up. The east driveway at Rogers Lake Park was
graded. Total weed kill was sprayed along the fence line at Mendakota
Pa rk.
The Utility Crew cleaned the sanitary sewer lines in the Kirchner easement,
Butler Avenue, View Avenue, Ashley Lane, Beebe Avenue, Knollwood Lane
and Court, Dodd Road from Delaware Avenue down to Ivy Falls Avenue, and
Medora Court and Road. A water box was repaired on Mendota Heights
Road and on Pond View. The fire hydrants on Victoria Curve were painted.
There was a sanitary sewer line backup on Lilac Lane. The city's line was
backed up with grease and small pieces of root. The seven manholes
downstream had good flow.
The Streets Crew were busy trimming trees on Decorah Lane, Pueblo Lane
and Pagel Road. The trees were then put in the chipper at the shop. They
cleaned storm grates throughout the city. A tree that fell on Valley Curve
was removed and cut up. Blacktop patching was done on the floating bridge
on Marie Avenue and pedway. Pot holes were filled on Eagle Road Road and
Victory Road.