Loading...
Pipeline 07 01 2011N E W S The Pipeline LETTER Public Works Engineering IIIJuly 1, 2011 Code Enforcement Public Works The Parks Crew repaired the Victoria Highlands Park ball field infield from vandalism. A car had driven over the infield and rutted the field. Sprinkler valves were repaired at Mendakota Park. The Utility Crew continues to paint fire hydrants, and preparing for the annual sanitary sewer cleaning and televising project. The Street Crew cut trees along Victoria Road from Douglas Road to Diane Road. Temporary seal coat signs were picked up from the project area and brought back to the shop. A mail box was replaced on Victoria Road that was hit by a fallen tree. Engineering Wagon Wheel Trail Reconstruction -Tree removal and vegetation clearing has begun. Saint Paul Regional Water Service has finished replacing the fire hydrants. Construction limits have been staked at the site. Xcel Energy is moving underground lines and relocating utility poles. Due to scheduling conflicts with Xcel Energy, pavement removal and road reconstruction will start later than anticipated. Mid -July is now expected for existing pavement removal. Physical construction/demolition of the road is expected to begin July 5t" with substantial completion by October 7t". Delaware Avenue Reconstruction - Construction activity is in full swing. Pavement has been removed, and the sub -base is being widened. Water main and storm sewer are being installed. The contractor will be working early on July 6t" to replace the water main and service stub to Henry Sibley High School. Project substantial completion is anticipated by Labor Day. Delaware Avenue is closed to through traffic and a detour is posted. Project information can be found at the Dakota County web site: http://www.co.dakota.mn.us/EnvironmentRoads/RoadConstruction/Current/63-22.htm Lower Mississippi River Watershed Management Organization (LMRWMO) - The LMRWMO Draft 3rd Generation Watershed Management Plan agency comment period has closed. The Draft Plan is available for view at http://www.dakotacountyswcd.org/watersheds/lowermisswmo. The next meeting of the LMRWMO is scheduled for July 21st, at Mendota Heights City Hall where a public hearing date will be set after agency comments have been discussed. Once public and agency comments are incorporated into the plan, it will be presented to the Councils of the member cities and Councils will be asked to pass a Resolution of support. Knollwood Neighborhood Street Rehabilitation - The Knollwood Neighborhood Rehabilitation project is currently out for bid. Bid opening is scheduled for July 13th with Council award of the contract at the July 19th meeting. Construction is expected to begin about August 1St with substantial completion of the project by October 7th. Crack sealing and sealcoating the southern portion of the project area has already been completed. American Public Works Association (APWA) Conference Committee - The Public Works Director attended a meeting of the Minnesota Chapter of the APWA to assist in planning the Fall 2011 Chapter Conference. Guest speaker and presentation schedules are being worked out for the conference that will be held in Brooklyn Center in mid-November. 2012 Street Projects - Staff is working on the Feasibility Reports for the 2012 street reconstruction and rehabilitation projects. Proposed for 2012 reconstruction are LeMay Lake Road, Lakeview Avenue, Kendon Lane, Furlong Avenue, and Victory Avenue. Proposed for 2012 Rehabilitation are Diane Road, Celia Drive, Rae Court, Adeline Court, Nina Court, Barbara Court, Douglas Road (east of Victoria), Marie Avenue and Mendota Heights Road (both from Delaware Avenue to Dodd Road).