Pipeline 05 06 2011N E W S The Pipeline
L E T T E R
Public Works°`
Engineering `y
May 6, 2011
Code Enforcement
Public Works
The Parks Crew striped the soccer fields at Kensington Park, and the new
soccer goals were installed on both fields. Crabgrass preventative was
applied in the parks as needed. More trash barrels were put in the parks.
Roses were planted at Rogers Lake Park that were donated by a resident.
The stone block was reset at Ivy Falls Park that was vandalized. Sprinkler
valves were repaired at Kensington Park on the soccer fields.
Pipe Services started cleaning and vacuuming the sump manholes.
Mosquito control biscuits were added to the sump manholes and storm lift
stations. The storm sewer trash guard was cleaned at Rogers Lake there
was a lot of debris.
Street sweeping has started of all city streets by Pearson Bros. and the
Streets Crew. They installed a new sign at the Pilot Knob site. They
continue to make mailbox and sod repairs from damage that occurred
during snow plowing.
Engineering
Wagon Wheel Trail Reconstruction - The project is advertised and
contractors are welcome to call for bid sets. Staff has scheduled the bid
opening for Wednesday May 11th (next week) at 10:00am, with contractor
award anticipated for the May 17th City Council meeting. Construction is
anticipated to begin mid-June with substantial completion by the end of
September.
Delaware Avenue Reconstruction - Dakota County has awarded the project
and the contractor has begun small portions of the construction project.
Traffic disruption is expected to begin in early June (after school is out) and
substantial completion of the project is anticipated before Labor Day
weekend. Delaware Avenue will be closed to through traffic during
construction, and a detour around the project will be provided and signed.
Project information can be found on the County web page:
http://www.co.dakota.mn.us/EnvironmentP,oads/`RoadConstruction/Current/63-22.htm
Dakota County Capital Improvement Plan (CIP) Updates - Dakota County is
requesting input from local communities on their 2012-2016 CIP. Projects
in the CIP are divided into three categories: Transportation, Parks, and
Buildings. Projects can be requested through City staff by June 24tH A
Final Draft will be published in September, and Cities will be asked for a
Council approved Resolution of support for the CIP at that time. The 2011-
2015 approved CIP can be found at the Dakota County web site:
http://www.co.dakota.mn.us/CountyGovernment/BudgetFinance/2011 Budget.htm.
Highway 13 at I-494 MnDOT Construction Project - Staff attended the pre -
construction meeting for the MnDOT project. The project will take
approximately 1 month to construct, and is scheduled to begin between May
11th and May 16th. The project consists of pavement repair, guardrail
installation, drainage/grading improvements, and landscape repair. The
contractor will be working from 6:30am to 5:30pm Monday through Friday.
Access to impacted properties will be maintained throughout the project, but
residents should expect periodic traffic reductions to one lane in either
direction. MnDOT contact for this project is Charles Graf at 651-406-4725.
Lower Mississippi River Watershed Management Organization (LMRWMO) -
The Draft LMRWMO 3rd Generation Watershed Management Plan has been
distributed for agency comments. The comment period ends on June 28th,
and Engineering Staff has a copy available for review. The Draft Plan is also
available at: http://www.dakotacountyswcd.org/watersheds/lowermisswmo. After
the agency comment period, there will be a public comment period when
the LMRWMO will ask for a Resolution of support from member city's
Councils. The next meeting of the LMRWMO is scheduled for June 16, at
City Hall where agency comments received to date will be discussed.
2012 City Street Projects - Staff is preparing to begin work on the design of
the 2012 street reconstruction and rehabilitation projects. This is beginning
a little earlier than normal as staff hopes to get our seasonal intern involved
in the site surveys and preliminary designs. Resolutions authorizing the
feasibility reports to be produced are scheduled to be presented for Council
approval at the May 17th City Council meeting. The 2012 program, as
identified in the 2011-2015 Street improvement Plan (SIP) are:
Reconstruction: Lemay Lake Road, Lakeview Avenue, Kendon Lane,
Furlong Avenue, and Victory Avenue
Rehabilitation: Diane Road, Celia Drive, Rae Court, Adeline Court,
Nina Court, Barbara Court, Douglas Road (east of Victoria), Marie Avenue
(between Dodd Road and Delaware Avenue), and Mendota Heights Road
(between Dodd Road and Delaware Avenue).