Loading...
Pipeline 05 13 2011N E W S The Pipeline LETTER Public Works May 13, 2011 Engineering Code Enforcement Public Works The Parks Crew planted donated trees in the parks as needed. Rec rock was hauled in to Hagstrom-King Park, Mendakota Park, and the Civic Center ball fields to level low areas. Brush was picked at Marie Park and hauled away. Rich did a sanitary sewer inspection at 1937 Dodd Road. A five foot repair had been done because of roots blocking the service. He sprayed for broadleaf weeds at the Fire Hall, North and South Kensington Park, Mendakota Park and Curley's Park. He helped Parks Crew plant trees. The Streets Crew continues working on the sod repair list. They are also working on repairing mailboxes. Trees were trimmed at the Trail Road and Marie Avenue corner because of sight distance problems. Pot holes were patched on Wagon Wheel Trail, Mendota Heights Road, Mendakota Drive and Concord Way. John A. and Tim helped Cliff work on a fire truck. Engineering Wagon Wheel Trail Reconstruction - Bids were opened on Wednesday morning, and an apparent low bidder was selected. Bid prices will be checked against the engineer's estimate and a recommendation for award of the contract is expected to be before Council at the May 17th meeting. Construction is anticipated to begin in early June with substantial completion by October 7th Delaware Avenue Reconstruction - Staff attended the preconstruction meeting with the contractor on Wednesday. Small, preliminary portions of the project are underway. Traffic disruption is expected to begin during the first half of June (after school is out), and substantial completion of the project is anticipated by Labor Day weekend. Delaware Avenue will be closed to through traffic during construction, and a detour around the project will be provided and signed. Project status and contact information can be found on the project page and the Dakota County web site: http://www.co.dakota.mn.us/EnvironmentRoads/RoadConstruction/Current/63-22.htm Highway 13 at I-494 MnDOT Construction Project - Construction started on Wednesday. The project consists of pavement repair, guardrail installation, drainage/grading improvements, and landscape repair. The contractor will be working from 6:30am to 5:30pm Monday through Friday, and access to adjacent properties will be maintained throughout the project. Residents should expect periodic traffic reductions to one lane in either direction throughout the project, which is scheduled for completion by June 12th. MnDOT project contact for this project is Charles Graf at 651-406-4725. Lower Mississippi River Watershed Management Organization (LMRWMO) - The Draft LMRWMO 3rd Generation Watershed Management Plan has been distributed for agency comments. Agency comments are due back to the consultant by June 28th, and Engineering Staff has a copy available for review. The Draft Watershed Management Plan is also available at the LMRWMO web page: http://www.dakotacountyswcd.org/watersheds/lowermisswmo. After the agency comment period, there will be a public comment period when the LMRWMO will ask for a Resolution of support from each member City's Councils. The next meeting of the LMRWMO is scheduled for June 16, at Mendota Heights City Hall where agency comments received to date will be discussed. 2012 City Street Projects - Staff is preparing to gather background information on the 2012 street reconstruction and rehabilitation projects. This is beginning a little earlier than normal as staff hopes to get our seasonal intern involved in the site surveys and preliminary designs. Authorization requests for feasibility reports to be produced are scheduled to be presented to Council at the May 17th meeting. The 2012 program, as identified in the Street improvement Plan (SIP) are: Reconstruction: Lemay Lake Road, Lakeview Avenue, Kendon Lane, Furlong Avenue, and Victory Avenue Rehabilitation: Diane Road, Celia Drive, Rae Court, Adeline Court, Nina Court, Barbara Court, Douglas Road (east of Victoria), Marie Avenue (between Dodd Road and Delaware Avenue), and Mendota Heights Road (between Dodd Road and Delaware Avenue). Municipal State Aid (MSA) Street Designation - Staff has been working with MnDOT on revising our MSA street designations. This is done periodically to allow MSA funds to be expended on specified streets. There is a specific list of criteria a street must meet in order to qualify as an MSA designated street, so options of altering our designations are limited. The recommended, revised MSA street map is scheduled to be before Council for approval at the May 17th meeting.