Loading...
Pipeline 04 15 2011NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline April 15, 2011 The Parks Crew put out more trash barrels by the ball fields. They finished sweeping the trails. The ball fields were dragged and groomed. The ball fields and soccer fields were swept. The lacrosse fields at Kensington west and east were striped. The ball field bases at Hagstrom Park, Mendakota Park, and the civic center were set out. Rich washed down the lift station wet wells of sand, gravel, grit and grease and then vacuumed off the bottom of the wet wells. Roots were cut in manholes in the Northland Drive easement and Dodd Road easement then he treated them with root killing chemicals. The roots were growing through the joints in the concrete barrel sections of the manhole. The jet hose was taken off the jet truck and reversed. Grease was cleaned off the floats at the Veronica lift station. Rich picked up a discarded snow blower on Ridgewood and put it in with the recycling. The Streets Crew took all plows, wings, and sanders off all plow trucks and prepared them for street sweeping. The yield sign that was broken off at the roundabout was replaced. A stop sign was put up Fieldstone Drive that was run over during the weekend. A new 35 mph speed sign was put up at Mendota Heights Road at Huber Drive. Tom and the Street Crew went to the Spring Equipment Expo in St. Cloud. The Parks new dump truck was on display and a lot of cities were checking it out. Engineering Wagon Wheel Trail Reconstruction - Advertisement notice has been sent to the Southwest Review and the Construction Bulletin. The project will be open for bid for a little over 3 weeks. We have scheduled a bid opening for May 11th at 10:OOam. Staff will be bringing forward an Ordinance amendment to codify the no parking areas of the project as a condition of receiving Municipal State Aid money from the project from MnDOT. Construction is anticipated to begin mid-June with substantial completion by the end of September. Delaware Avenue Reconstruction - Dakota County held the bid opening on April 5th. Danner Construction was the apparent low bidder. Danner Construction built the Mendota Heights Road/Visitation Drive Roundabout. With this bid opening, the project remains on schedule for construction start in early June and substantial completion by Labor Day weekend. The final few easements needed of the project are being negotiated with area residents. Project information can be found on the County web page: http://www.co.dakota.mn.us/EnvironmentRoads/RoadConstruction/Current/63-22.htm Knollwood Neighborhood Rehabilitation - Public Hearing for this project is scheduled for the April 19th City Council Meeting. A neighborhood informational meeting was held on March 30th at City Hall. Construction is anticipated for summer of 2011, beginning in late June to early July. 2011 MnDOT Construction Projects - The Minnesota Department of Transportation (MnDOT) has published its list of 2011 construction projects. 2011 projects scheduled for the Mendota Height area include: TH 13 & I -35E Exit/Entrance Ramps - Traffic Signal Installation scheduled for installation July 2011. TH 13 from I-494 to Pilot Knob Road - Pavement Resurface, Guardrail Installation, & Drainage Improvements scheduled for construction May/June 2011. I -35E from Lone Oak Road to West 7r" Street - Pavement Overlay, Repair, & Replacement scheduled for construction July/August 2011. TH 149 (Dodd Road) from Mendota Heights Road to Smith Avenue - Pavement Repair and Sealcoat Treatment scheduled for construction October/November 2011. Staff will present a brief overview of these projects at the April 19th City Council meeting. Dakota County Capital Improvement Plan (CIP) Updates - Dakota County is asking for input from local communities on their 2012-2016 CIP. Projects are divided into three categories within the CIP: Transportation, Parks, and Buildings. Projects can be requested by local communities, through City staff by June 24th, for inclusion in the plan. A Final Draft will be published in September, and Cities will be asked for a Resolution of support for the CIP at that time. The 2011-2015 approved CIP can be found at the Dakota County web site: http://www.co.dakota.mn.us/CountyGovernment/BudgetFinance/2011 Budget.htm. Rogers Lake Legislative Meeting - Staff met with State Representative Rick Hansen and John Jaschke, Executive Director of the Minnesota Board of Water & Soil Resources (BWSR) on Wednesday to discuss long-term plans for Rogers Lake and its surrounding drainage area. Representative Hansen and Mr. Jaschke requested the meeting to get an update on the weed control operations at the lake, and the efforts of the Lower Mississippi River Watershed Management Organization (LMRWMO) to get a drainage and water quality study completed for the lake. Earlier this year the LMRWMO requested the Minnesota Pollution Control Agency include Rogers Lake in an area -wide study of stormwater runoff and water quality. Staff provided these updates and pledged to continue keeping Representative Hansen's office informed of our progress.