Loading...
Pipeline 04 01 2011NEWS LETTER The Pipeline Public Works Engineering April 1, 2011 Code Enforcement � Public Works The Parks Crew cleaned up the snowplows from the pickup trucks and hauled them to the water tower for summer storage. Steel trash cans for the parks were picked up from Twin City Containers. John Ambrose welded the cracks on the plow for the Kubota. The plow was damaged from a frost heave on the pedway while being plowed from last week's snow storm. Rich cleaned sanitary sewer lines of roots on Keokuk, Ocala, Decorah and Pontiac Place. On Monday at 4:00 P.M. Electro Watchman called because of a power outage at the St. Thomas lift station. The power was restored shortly after the call. Mosquito Control contacted Rich wondering if the city would help them with this season's mosquito control in our sump manholes as the city has done in the past. They will be dropping off control products in late April for Rich to apply. The 2010 sewer relining project is finally underway and Visu-Sewer is this year's contractor. The Streets Crew replaced bent streets signs on the Highway 110 Frontage Road by Town Center. Potholes were filled on Marie Avenue, Mendota Heights Road and other streets. Salt was dumped out of all the plow trucks, they were washed up, and the sanders were steam cleaned and greased. The front cutting edge on plow #304 was changed with a new one. Engineering Wagon Wheel Trail Reconstruction - Final plans for the reconstruction project have been submitted to MnDOT for review. MnDOT needs to sign off on our plans in order for us to utilize our MSA funding for the street reconstruction portion of the project. Once MnDOT approval is received, the project will be advertised for bid. We are anticipating a scheduled bid opening date in early May. Delaware Avenue Reconstruction - Dakota County has this project advertised for bids with a scheduled bid opening date of April 5t". Once the County opens the bids, we expect to hear the bidding results and who was selected as the successful bidder by the end of next week. The project remains on schedule for construction start in early June and substantial completion by Labor Day weekend. Project information can be found at: http: //www.co.dakota. mn. us/EnvironmentRoads/RoadConstruction/Current/63-22. htm Knollwood Neighborhood Rehabilitation - A neighborhood informational meeting was held on March 30th at City Hall. Five residents attended to ask questions about the project. No significant issues were brought to Staff's attention and the project remains on schedule. A Public Hearing on this project is anticipated for the April 19th City Council meeting. Construction is anticipated for summer of 2011. Lower Mississippi River Watershed Management Organization (LMRWMO) - Staff attended the monthly meeting of the LMRWMO at the Inver Grove Heights Community Center along with appointed citizen representative Mary Jeanne Schneeman. The LMRWMO is finalizing the update of their Watershed Management Plan which includes new stormwater management rules, and water quality improvement projects planned over the next ten years. Once completed and adopted by the LMRWMO, Mendota Heights and other member Cities will have to update their Local Surface Water Management Plans to reflect the new rules. The final LMRWMO Watershed Management Plan in anticipated to be completed by August. Highway 13 Construction Projects - These projects have been in the news recently as residents in the Lilydale area are asking questions about the projects. MnDOT is planning on installing traffic signals at the on/off ramps of I -35E at Highway 13 this summer. This project is the first of 3 projects planned by MnDOT for the Highway 13 corridor. Phase 2 (anticipated 2012 construction) is a pavement reconstruction project in the City of Mendota that will provide curb, gutter, and storm sewer for a section of Highway 13 north and east of the post office. This phase will also construct a new stormwater treatment pond between Highway 13 and the river. Phase 3 (anticipated 2015 construction) is the largest of the three construction projects and will reconstruct Highway 13 from Mendota to I -35E, providing curb, gutter, and storm sewer to the highway corridor along with new pavement. Questions about these projects can be directed to the MnDOT project manager, Sheila Kauppi, at 651-234-7718. Resurfacing of I -35E - MnDOT notified staff this week that they are intending to resurface I -35E from Lone Oak Road in Eagan, north to West 7th Street in Saint Paul during the summer of 2011. The bulk of this construction activity will be taking place at night to minimize disruptions in daily traffic. MnDOT is anticipating construction to start in July.