Cliff and John A. made a major repair on the Xmark mower to repair an oil
leak. John B. attended a tree seminar at Bethel College. Servicing work
continues on the summer equipment and the mowers are being cleaned up.
Rich was called in Sunday at 1:00 P.M. by Sergeant Garlock for a possible
sanitary sewer blockage at 760 Wentworth Avenue. Rich checked the city's
sanitary sewer line which was fine. The property owner's portion was
blocked. He checked the sanitary sewer manholes for the Wagon Wheel
Trail street project. He found four manholes that need new concrete rings
which deteriorate because of sewer gas. He put root killer in the sanitary
sewer pipes on Lexington Avenue.
On Saturday, March 12th the main streets were salted after a light snow fall.
Storm grates in the Rolling Green area and other areas of the city are being
unplugged. John M., Tom, and George had a meeting with a representative
from Mack Trucks regarding the problems with the snow plow rear ends.
Mailboxes continue to be repaired.
Engineering
Wagon Wheel Trail Reconstruction - Council approved the final plans and
specifications at their March 15th, 2011 meeting, and authorized
advertisement of the project for construction bids. The final plans
incorporated all five changes requested by Council at the December 7th,
2010 meeting when the plans were ordered. These five changes (narrowing
curb at cul-de-sac intersections, keeping trail no further than 4 -feet from
the curb, eliminating trail west of Curly's Addition Trail but prepping the
space for future construction, Alice Lane cul-de-sac repair to be mill &
overlay rather than pavement replacement, and barrier style curb to be
(used throughout) were the result of two meetings worth of public hearing
and staff research into resident issues. This project is anticipated to be
under construction in early June 2011 with substantial completion by the
end of September 2011.
Gun Club Lake Watershed Management Organization (GCLWMM - The
GCLWMO met on Wednesday afternoon at the Moonshine Park Retreat
Center in Eagan. Due to scheduling conflicts, staff was unable to attend.
Appointed Resident Representative Larry Craighead was in attendance.
Discussed at the monthly meeting was the proposed FY2012 WMO Budget,
the financial statements form the annual compliance audit, updates on
Board of Water and Soil Resources (BWSR) rule revisions and project
updates on: 1) Schwanz Lake (Eagan) runoff reduction project; 2) Eagan
Groundwater Recharge Research project; and 3) Blackhawk and Thomas
Lake (Eagan) Management Plan Updates.
Lower Mississippi River Watershed Management Organization (LMRWMO) -
Invitations for the LMRWMO interactive stormwater management workshop
have been sent out. The workshop is scheduled for the morning of April
30th from 9:30 to noon at the Science Museum of Minnesota. The workshop
is free, but registration will be required. RSVP information can be found in
the invitation e-mail. Space is limited, so prompt RSVPs are requested.
Positive RSVPs are requested by April 15th so the hosts can plan on an
accurate number attending. The workshop is focused on stormwater
management issues, is intended to be educational and interactive, and is
geared towards community and civic leaders.
Mack Truck/ArvinMeritor Meeting - Staff met with representatives from
Mack Trucks and ArvinMeritor (manufacturers of the rear differentials on 3
of our 4 snowplows) to discuss the problems we have been having with our
plow trucks. During the February 20th -21St snow storm, two of our plows
had their rear differentials (the drive unit for the rear axle) fail. After
inspection, it appears the 3rd plow with the ArvinMeritor rear differential is
close to failure. The Mack and ArvinMeritor representatives stated that this
was not an issue exclusive to Mendota Heights, and that several other cities
were experiencing the same problems. They pledged to talk to other
municipalities that utilize the same rear differentials, and to arrive at some
options for us to employ that will provide greater dependability and provide
better assurance that our plows will remain functional during snow
emergencies. Once we hear what Mack and ArvinMeritor have to say, staff
plans on contacting the State contracting representative to keep them
informed about the issues.