Pipeline 03 11 2011NEWS The Pipeline
L E T T E R
Public Works
Engineering r•
Code Enforcement cj March 11, 2011
Public Works
The Parks Crew cleared snow from the trails and parking lots after two snow
falls this week. They continue to do maintenance on the summer
equipment. They cleaned and maintained the blower and broom.
Rich plowed the lift stations as needed. He attended the annual traffic
safety seminar. He also attended a preconstruction meeting with Visu-
Sewer for the 2011 sanitary sewer lining project. He did a sanitary sewer
inspection at 682 Callahan Place. A homeowner had roots break apart their
sanitary sewer line and Pipeline Company did a spot repair of the broken
line for the homeowner.
Tom, Rich and the Street Crew attended a work zone traffic control seminar.
The Street Crew had an early start on Monday the 7th when they plowed all
streets and salted after 11/2 inches of snow. They had another early start on
Wednesday the 9th after a 1/2 of snow fell. Tim helped Cliff fix the leaking
hydraulic hose on the tractor. John A. fixed the plow shoes on plow truck
#312. He also welded on a new adjusting rod and replaced worn out parts.
Engineering
Wagon Wheel Trail Reconstruction - Staff has completed the plans for the
2011 reconstruction project. Council ordered that the plans be prepared at
their December 7, 2010 meeting, and input and cooperation have been
tremendous as staff discovered issues and worked through them with area
residents. The final plans will be before Council with a request to accept the
plans and authorize advertisement for bids at the March 15th Council
meeting. This project is anticipated to be under construction in early June
2011 with substantial completion by the end of September 2011.
Delaware Avenue Reconstruction - Dakota County has finished the plans for
the reconstruction project, they have received permission from MnDOT to
advertise, and they are anticipating a bid opening date of April 5th. This
puts the project on schedule for a summer 2011 construction. The project
will widen Delaware Avenue from a 2 -lane road to a 3 -lane road from
Highway 110 to just north of Marie Avenue. Construction is anticipated to
be underway in late May and substantially complete by the opening of
school on September 6th so as to not impact Henry Sibley High School.
Information about this project can be found at:
http://www.co.dakota.mn.us/EnvironmentRoads/RoadConstruction/Future/6
3-22.htm.
Concrete Paving Association of Minnesota (CPAM) - The Public Works
Director gave a presentation to the annual CPAM Conference in Duluth on
Friday morning. Along with a fellow Civil Engineer Officer from the Air
National Guard, John talked at the conference about construction projects
worked on in Afghanistan during his recent deployment. John was
responsible for all contracted construction projects on the airfield while
activated in support of Operation Enduring Freedom at Bagram,
Afghanistan. John was on extended military leave from the City from
November 2009 to August 2010.
Lower Mississippi River Watershed Management Organization (LMRWMO) -
Invitations for the LMRWMO interactive stormwater management workshop
were sent out on Monday (3/7/11). The workshop is scheduled for the
morning of April 30th from 9:30 to noon at the Science Museum of
Minnesota. The workshop is free, but registration will be required. RSVP
information can be found in the invitation e-mail. Space is limited, so
prompt RSVPs are requested. The workshop is focused on stormwater
management issues, is intended to be educational and interactive, and is
geared towards community and civic leaders.
Delaware/I-494 Interchange: Dakota County Visioning Study - Staff met with
members of the citizen group that formed in opposition to a proposed interchange
at Delaware Avenue and I-494. The group was seeking updated information on
the status of the projects contain in the approved Visioning Study produced by
Dakota County. The Visioning Study identified a potential new access interchange
to I-494 to be located east of the Delaware Avenue bridge, without accessing
Delaware Avenue. The City of Inver Grove Heights is currently working on their
Northwest Area Collector Street Study that is intended on identifying City street
improvements that will be needed as the projects in the Dakota County study are
developed. Information on the City's study can be found at
www.ighnwareacollectorstreetstudy.com.