Loading...
Pipeline 02 11 2011NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline February 11, 2011 a�entti� e's �� The Parks Crew cleaned out snow in the east parking lot at Rogers Lake Park for the Fire ice rescue drill. The door handle at the Marie Park warming house was repaired. Truck #501 was taken to Newport Auto for some body repair work. Rich was called in at 1:30 a.m. Sunday because of a float malfunction at the Lilydale lift station. He found dental floss wrapped around the float. There was a sanitary sewer blockage on Monday on James Court in the homeowner's portion of the line. The city's portion of the line was fine. Rich put a new hose reel swivel on the hose reel at the Fire Department. A new LED digital pump display was put in at the main lift station. The Streets Crew came in on Sunday, February 6, 2011, because of light snow. The main lines and hills were salted. Fire hydrants were cleared of snow in the business park. Snow was also pushed back at the intersections in the business park. John Ambrose finished making up cages for the police cars. John also removed the wear bars on the parks tractor that is used for dragging ball fields. All plow trucks were steam cleaned, greased and looked over. Engineering Wagon Wheel Trail Reconstruction - Engineering staff held a follow-up neighborhood meeting on Wednesday, February 9t" from 6:00 to 7:30 at City Hall for the affected property owners. Staff presented preliminary plans and worked one-on-one with residents to resolve specific issues with the individual parcel owners along the project route. Approximately 30 residents attended the informal meeting. Among the main issues discussed with residents were tree removal and grading to fill the ditches on either side of the roadway. Some residents were asked to grant a temporary construction easement so the grading could be accomplished properly. This project is anticipated to be under construction in early summer 2011 with substantial completion by the end of September 2011. American Public Works Association (APWA) Conference Committee - The Public Works Director attended a meeting of the APWA Conference Committee on Tuesday. The committee is responsible for organizing the two APWA conferences held each November and May. Work at this meeting was focused on the May 2011 Conference. Committee members are responsible for arranging topics and presenters as well as moderating the discussions during the conference. This spring's conference is themed around "Social Media and Emerging Communications Technologies." Public Works staff from around the state will conference in May to share their thoughts, ideas, and experiences on this topic. State Aid Needs Updated -Mendota Heights receives Municipal State Aid (MSA) money each year from the State to offset construction and maintenance costs of some of its high traffic streets. Recently, MnDOT transferred title work to existing frontage roads along Highway 110 and Highway 55 (Centre Pointe Curve, Lemay Lake Road, Victoria Curve and Mendota Road) to the City. To help offset future reconstruction and maintenance costs, the city is asking MnDOT to add these streets to our needs list, while removing some existing designated routes (Delaware Avenue, Emerson Ave and Decorah Lane). The city is only allowed 20 percent of total mileage to be supported by state funds. This change will allow the city to gain greater financial support for its existing roadway network. Delaware Avenue Reconstruction - The Dakota County design plans are being reviewed by MnDOT. As a requirement of the MNDOT funding, Delaware Avenue will need to be designated as a no parking area. Staff is preparing an Ordinance to add Delaware Avenue to the areas of no parking allowed in the City, and it is anticipated that the Ordinance will be before City Council at the February 15th meeting. The area is currently signed for no parking, but the area is not in city code as a no parking area.