Loading...
Pipeline 10 21 2011N E w s -)...,The Pipeline LETTER ' Public Works �--� Engineering — October 21, 2011 Code Enforcement Public Works The Parks Crew cleaned up the Kensington building after vandalism. Tree brush and limbs were cleaned up at Wentworth and Ivy Falls Parks. The soccer nets were removed from the goals and put away for winter storage. The water meters were removed from the buildings at Mendakota and Kensington Park. The Utilities Crew assisted the Parks Crew with tree cutting at Wentworth and Ivy Parks. Leaves were mulched at the Veronica lift station. Trucks 404 and 409 were washed and waxed for the upcoming winter season because the snow will be coming! The Streets Crew and All Seasons Tree Service trimmed huge trees on Valley Curve; one of the trees was dropping huge limbs. The rear end was taken out of truck 304 to get repaired by Catco in Burnsville and put back in. They helped the Streets Crew clean up limbs that were cut off trees in Wentworth and Ivy Falls Park. Engineering Wagon Wheel Trail Reconstruction - Paving of the trail and driveways are substantially complete. The contractor will begin grading the boulevard areas with top soil and placing sod. Traffic signs are currently being manufactured and should be installed within two weeks. The contractor will also begin digging the 3 proposed rain gardens for the project. 2012 Projects - The continuation of the Marie Avenue Rehabilitation Project public hearing was held on Tuesday (10/18). Council ordered the improvement as originally submitted but giving the residents the option to submit a revised petition showing majority support for additional traffic safety enhancements. The petition would have to have public support for the additional funding necessary for the improvements. Staff held an informational meeting for the Lemay Lake Improvement Project. Residents were mostly in support of the project. However cost and new curb will need to be authorized by City Council. The public Hearing is scheduled for November 15, 2011. Knollwood Lane Rehabilitation - The assessment hearing was held on Tuesday, October 18, 2011. No public comments were received during the hearing and the assessment was unanimously approved. MnDOT Pro ie� cts The following projects are under the management and supervision of MnDOT and are presented as information only. Contacts for each individual project are listed after the project update. I -35E Resurfacing - MnDOT began resurfacing I -35E on August 18th. The project is anticipated to last until November 1St. In addition to the pavement resurfacing, MnDOT will be installing new guardrails, improving drainage, and upgrading exit and entrance ramp signals. The project will be accomplished mainly at night and during off-peak (non -rush hour) traffic times. Lane closures are expected during off-peak traffic times. Information on the project can be found at the MnDOT project web page: http://www. dot. state.mn.us/metro/projects/i35eeagan/index.htmI I -35E & Highway 13 Traffic Signal Installation - Traffic signals at the exit and entrance ramps to I -35E from Highway 13 will begin on approximately September 15th. Information about the can be found on the MnDOT project web page: http://www. dot. state.mn.us/metro/projects/hwy13mendota/