Loading...
Pipeline 01 14 2011NEWS The Pipelin LETTER _ Public Works Engineering I I I I , = January 14, 2011 Code Enforcement ' Public Works The Parks Crew cleaned the hockey rinks of snow and continue to flood them. They plowed the parking lots at Rogers Lake Park and Mendakota Park. A switch was repaired on the 505 Toro grounds master. Rich plowed the middle area of the city this week because Andy is out. He also plowed and shoveled the lift stations. Fire hydrant makers were added to fire hydrants where needed. The Streets Crew winged back snow with the grader in the Copperfield area and the pedway on Huber Drive. Snow in the cul-de-sacs north of Highway 110 was pushed back with the loader. The cutting edges on the front plow and wing were changed on truck 303. City streets were salted on January 10, 2011. All streets were plowed of the two inch snowfall that fell on January 11, 2011. Engineering Delaware Avenue Reconstruction (Dakota County) - Dakota County Staff has submitted their design package to MnDOT for review. While MnDOT is looking over the design, Dakota County will be finalizing the final few right- of-way acquisitions and preparing to bid the project. The project is scheduled to be in construction during the summer of 2011, with substantial completion by October of 2011. It is possible that MnDOT may require the City to designate a No Parking area along the west side of Delaware (West Saint Paul would designate the east side). If this requirement is forwarded from MnDOT, City Staff will bring an Ordinance before Council. Residents can learn more about this project at: http://www.co.dakota.mn.us/EnvironmentRoads/RoadConstruction/Future/63-22.htm Wagon Wheel Trail Reconstruction - Staff is continuing to work on grading and elevations for the project area to ensure positive drainage and to calculate the cut and fill areas. This project is anticipated to be under construction in early summer 2011 with substantial completion by the end of September 2011. Knollwood Lane Neighborhood Rehabilitation - Staff has prepared the Feasibility Report for the Rehabilitation of the Knollwood Lane neighborhood streets. The Feasibility Report to be before Council at their January 18th meeting. The project is proposed to resurface the streets in the neighborhood either by pavement replacement, mill & overlay, or crack seal & sealcoat. Gun Club Lake Watershed Management Organization (GCLWMO� - Staff attended a meeting of the GCLWMO with appointed Citizen Representative Larry Craighead. The main area of discussion at the meeting was the Grant Tracking and project update for the Schwanz Lake Rain Garden project in Eagan. Staff informed the GCLWMO of the City's efforts for water body maintenance and that the topic would be discussed at the upcoming Goal Setting Workshop.