Pipeline 01 14 2011NEWS
The Pipelin
LETTER _
Public Works
Engineering I I I I , = January 14, 2011
Code Enforcement '
Public Works
The Parks Crew cleaned the hockey rinks of snow and continue to flood
them. They plowed the parking lots at Rogers Lake Park and Mendakota
Park. A switch was repaired on the 505 Toro grounds master.
Rich plowed the middle area of the city this week because Andy is out. He
also plowed and shoveled the lift stations. Fire hydrant makers were added
to fire hydrants where needed.
The Streets Crew winged back snow with the grader in the Copperfield area
and the pedway on Huber Drive. Snow in the cul-de-sacs north of Highway
110 was pushed back with the loader. The cutting edges on the front plow
and wing were changed on truck 303. City streets were salted on January
10, 2011. All streets were plowed of the two inch snowfall that fell on
January 11, 2011.
Engineering
Delaware Avenue Reconstruction (Dakota County) - Dakota County Staff
has submitted their design package to MnDOT for review. While MnDOT is
looking over the design, Dakota County will be finalizing the final few right-
of-way acquisitions and preparing to bid the project. The project is
scheduled to be in construction during the summer of 2011, with substantial
completion by October of 2011. It is possible that MnDOT may require the
City to designate a No Parking area along the west side of Delaware (West
Saint Paul would designate the east side). If this requirement is forwarded
from MnDOT, City Staff will bring an Ordinance before Council.
Residents can learn more about this project at:
http://www.co.dakota.mn.us/EnvironmentRoads/RoadConstruction/Future/63-22.htm
Wagon Wheel Trail Reconstruction - Staff is continuing to work on grading
and elevations for the project area to ensure positive drainage and to
calculate the cut and fill areas. This project is anticipated to be under
construction in early summer 2011 with substantial completion by the end
of September 2011.
Knollwood Lane Neighborhood Rehabilitation - Staff has prepared the
Feasibility Report for the Rehabilitation of the Knollwood Lane neighborhood
streets. The Feasibility Report to be before Council at their January 18th
meeting. The project is proposed to resurface the streets in the
neighborhood either by pavement replacement, mill & overlay, or crack seal
& sealcoat.
Gun Club Lake Watershed Management Organization (GCLWMO� - Staff
attended a meeting of the GCLWMO with appointed Citizen Representative
Larry Craighead. The main area of discussion at the meeting was the Grant
Tracking and project update for the Schwanz Lake Rain Garden project in
Eagan. Staff informed the GCLWMO of the City's efforts for water body
maintenance and that the topic would be discussed at the upcoming Goal
Setting Workshop.