October 26, 2012
The Parks Crew mulched leaves in the parks. A security light bulb was
replaced on the side of the public works garage. Truck 501 was taken to
Kremer Spring for a front end alignment. They met with a contractor for the
repairs to the culverts in Valley and Wentworth Parks. Cutting edges for the
plows were picked up.
The Utilities Crew changed a broken gasket on the check valve at the Mendota
Heights Road lift station. Leaves were blown out to the street at the Culligan lift
station for the street sweepers to pick up next week
Street crew worked on a new jack for the utility truck. They took off the old
jack and welded on a new one. They made up a new sign for Northland
Drive at Enterprise Drive and installed it. Signs were put up at the bonfire
site. They worked at the dump site to get ready for the fall sweeping.
Engineering
City Projects (construction year)
Lemay Lake Road Reconstruction (2012I - The project is substantially
complete. Wear course installation was scheduled for today (10/26/12),
weather permitting. Soil tests prior to base course pavement revealed an
outstanding foundation for the pavement surface. An assessment hearing
for the project was held on October 16th at the City Council meeting.
Marie Avenue Rehabilitation (2012) - The project is substantially completed.
Only minor punch list items remain. Staff will review the seed/sod
conditions in the spring.
Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) -
The consultant continues to work with MnDOT, evaluating design elements
for the pedestrian safety improvements to ensure they meet their design
requirements. 95% design drawings have been submitted and are under
review by City staff. An update for City Council from the consultant is
anticipated in December. Final plans are anticipated in late fall/early winter
with bidding and construction in 2013.
Hunter Lane/Orchard Place Neighborhood Improvements (20131 - City
Council ordered the project at the October 16th City Council meeting. Staff
is working on design and building the final plan set. A second informational
meeting is anticipated over the winter to go over specific property design
issues with affected residents. Final plan completion is expected in March
with bidding in April/May, and construction starting in June 2013.
Crown Point & Overlook Neighborhood Rehabilitations (2013) -Staff is
working on the final design plans. If necessary, a neighborhood open house
will be held over the winter to work out specific design issues with property
owners. Final plans will be prepared and bids are anticipated in the spring
for 2013 construction.
Other Activities
Saint Paul Regional Water Service (SPRWS) Water Meter Replacements -
SPRWS will be replacing water meters on residences this fall. Residents are
encouraged to contact SPRWS' contractor, Northern Water Works Supply to
schedule a time for their meter replacement. Northern Water Works Supply
can be reached at 1-888-497-4171, or appointments can be made at their
web page www.nwwsonline.com.
Future Cities Competition - Staff continued to mentor and assist the middle
school teams at Friendly Hills Middle School in the 2012 Future Cities
Competition this past week. The teams are judged on four different products
in the competition: a SimCity model of their city, a scale model of their city,
a written report, and an oral presentation about their city. The students are
finishing up their project narratives and computer models, and will soon
begin building their scale models and rehearsing their presentations for the
competition. Friendly Hills Middle School has won various awards in this
competition over the past three years, and is in a position to finish near the
top of the competition once again.
Lower Mississippi River Watershed Management Organization (LMRWMO) -
Staff attended the monthly meeting of the LMRWMO with the City's
appointed primary and alternate representatives. Mendota Heights hosted
the meeting. An update on the lake study being conducted by LMWMO was
provided and the renewal of the Joint Powers Agreement (JPA) was
discussed. The JPA will be presented to City Council for approval at their
November 20th meeting.
Municipal State Aid (MSA) Pre -Screening Meeting - Staff attended the
annual MSA pre-screening conference in Vadnais Heights. At this
conference, municipalities that are eligible for MSA funding (population of
5,000 or greater) are first notified of next year's MSA amounts. Four new
cities are being added to the MSA program with no appreciable increase in
state appropriation to the program. Therefore all MSA cities are seeing their
allocation drop slightly for 2013. Mendota Heights is expected to see a
reduction of approximately $13,800 in MSA funding, a 2.68% reduction
from 2012.
Fall Street Sweeping - The City will be sweeping the streets starting on
Monday, October 29th to pick up leaves from the fall. As a reminder,
residents are not allowed to rake their yards into the street, and are
encouraged to take their leaves and grass clippings to a compost facility.