Code Enforcement�-
Public Works
The Parks Crew cut weeds at the bonfire site. Tree limbs at the public
works garage were hauled to the bonfire site. The mower deck was
removed on the Kubota and the broom installed for winter. The soccer goals
were removed from Kensington South Park and put in winter storage. The
ball field and soccer complex were fertilized along with the fire hall, city hall
and all neighborhood ballfields.
The Streets Crew spent the week with Pearson Brothers sweeping up the fall
leaves. The bonfire pile was pushed up a couple of times. Black dirt was
brought in from Independent Black Dirt of Rosemount.
The Utility Crew Cut roots in the sanitary sewer lines on Dodd Road near
Wentworth Avenue, Oak Street, and Eagle Ridge. Root killing chemicals
were put in the sanitary sewer lines on South Freeway Road, and Oak
Street. Sanitary sewer lines were cleaned on Victoria Road. Leaves were
mulched at the Veronica lift station.
Engineering
City Projects (construction year)
Lemay Lake Road Reconstruction (2012 - The final lift of asphalt has been
placed. Minor punch -list items remain and re -installation of residents'
mailboxes is underway. An assessment hearing for the project was held on
October 16th at the City Council meeting.
Dodd Road/Hiahwav 110 Intersection Pedestrian Imarovements (2013) -
Staff has reviewed the 95% design drawings and have provided comments
to the consultant. The consultant is working closely with MnDOT to ensure
design elements meet their standards and requirements. An update for City
Council from the consultant is anticipated in December. Final plans are
anticipated in late fall/early winter with bidding and construction in 2013.
Hunter Lane/Orchard Place Neighborhood Improvements (20131 - City
Council ordered the project at the October 16th City Council meeting. Staff
is working on the final design and putting together the final plan set. A
second informational meeting is anticipated over the winter to go over
specific property design issues with affected residents. Final plan
completion is expected in March with bidding in April/May, and construction
starting in June 2013.
Crown Point & Overlook Neighborhood Rehabilitations (2013) -Staff is
working on the final design plans. If necessary, a neighborhood open house
will be held over the winter to work out specific design issues with property
owners. Final plans will be prepared anticipating spring 2013 construction.
Other Activities
Saint Paul Regional Water Service (SPRWS) - SPRWS has replaced over
60% of the water meters in Mendota Heights. Residents are encouraged to
contact SPRWS' contractor, Northern Water Works Supply to schedule a
time for their meter replacement, if it has not been changed out already.
Northern Water Works Supply can be reached at 1-888-497-4171, or
appointments can be made at their web page www.nwwsonline.com. Staff
also attended the annual water rate meeting for municipal clients at SPRWS
on Friday morning. SPRWS is proposing restructuring their rates for 2013 to
include a flat fee for all customers. Consumption rates are being proposed
to decrease slightly to compensate for the flat fee. The proposed rate
restructure will be before the Saint Paul City Council for approval in
December. Contact SPRWS at 651-266-6350 for further information.
Gun Club Lake Watershed Management Organization (GCLWMO� - The
Public Works Directors from the three member cities of the GCLWMO
(Mendota Heights, Inver Grove Heights, and Eagan) met on Tuesday to
discuss the future governance options for the GCLWMO. The GCLWMO's
Watershed Management Plan is in need of renewal, and the WMO Board is
discussing options to make the organization more efficient and effective for
its member Cities.
Fall Street Sweeping - Fall street sweeping was completed this week. The
City sweeps the streets in the fall to collect leaves and other organic debris
as a preventative measure to keep these items from clogging storm sewers
and getting into our storm water treatment ponds. The City will sweep the
streets again in the spring.
Five -Year Infrastructure Plans - Staff is working on an update for the Street
Improvement Plan (SIP) and the Sanitary Sewer Improvement and
Maintenance Plan (SSIMP). Projects within the plans are being prioritized
based on infrastructure need and available resources. The 2013-2017
versions of these plans will be presented to City Council at the December 4t"
meeting. Once acknowledged by the Council the plans will be posted on the
City's web -page.