Loading...
Pipeline 05 04 2012NEWS LETTER The Pipeline Public Works , Z 41 Engineering a Code Enforcement May 4, 2012 gyp;19 ?a Public Works The Parks Crew painted the walls at Rogers Lake that contained graffiti. The skate park equipment at Rogers Lake Park was moved so crack filling could be completed. The 60 foot base anchors were reinstalled at Hagstrom King Park softball field. The Utilities Crew did a sanitary sewer inspection at 1004 Overlook Road. Broadleaf weeds were sprayed at Victoria Highlands Park, Valley Park, Wentworth Park, Ivy Park, Marie Park, City Hall and Civic Center Park. A regional safety meeting on lock out/tag out procedures and personal protective equipment was attended in West St. Paul. The Streets Crew made up new signs that will be installed on the backstop at the civic center ball field saying Mertensotto Field at Civic Center. Sod damage repair was completed at Vail Drive, Summit Lane, Second Avenue at Dodd Road and other areas. Street signs at Chippewa Avenue and Annapolis Streets were taken down, brought back to the shop to be cleaned of graffiti and then reinstalled. Storm grates at ponds were also cleaned. Engineering Lemay Lake Road Reconstruction - Final plans are nearly complete. Staff held an additional informational meeting with residents affected by the project last week. The meeting was well attended and a number of property specific issues were addressed. Final plans are anticipated later in May. Marie Avenue Rehabilitation - City Council awarded the construction contract to Hardrives, Inc. at their May 1St meeting. A preconstruction meeting is anticipated for next week. The Marie Avenue striping plan has been posted on the project page at the City's web site and notification has been sent to the Marie Avenue residents with the web link included. Diane Road Neighborhood/Mendota Heights Road Rehabilitation - McNamara Contracting has begun construction. The project schedule shows the project completed by early June. An assessment hearing is anticipated in October. Wagon Wheel Trail Bicycle/Pedestrian Connection - City Council, at the request of the Parks and Recreation Commission, discussed completing the bicycle/pedestrian trail along the north side of Wagon Wheel Trail between I -35E and Lexington Avenue. Staff is contacting affected residents, and a resolution approving the addition to the path will be on the May 15th City Council agenda. Overlook & Crown Point Neighborhoods Rehabilitation (2013) - City Council authorized production of a Feasibility Report for this project at their May 1St meeting. Proposed for rehabilitation (pavement replacement) are Overlook Road, Overlook Lane, Summit Lane north of Marie Avenue, Lilac Road south of Douglas Road, Crown Point Drive, Crown Court, and Crown Circle. Completion of the feasibility report is anticipated in July. A neighborhood meeting is anticipated for late summer/early fall followed by a public hearing before the City Council in October. Hunter/Orchard Reconstruction & Culligan/Glenhill Rehabilitation (2013) - City Council authorized production of a Feasibility Report for this project at their May 1St meeting. Proposed for reconstruction are Hunter Lane, Orchard Place, and Culligan Lane east of Glenhill Road. Also proposed with this project is the rehabilitation (pavement replacement) of Glenhill Road, Culligan Lane west of Glenhill Road, Veronica Lane, and Orchard Circle. Completion of the Feasibility Report is anticipated in July. A neighborhood meeting is anticipated for late summer/early fall followed by a public hearing before the City Council in October. Dakota County Capital Improvements Plan (CIP) - City Council discussed several projects at their May 1St meeting that could potentially be requested as part of the annual review of the Dakota County CIP. Staff will bring a formal request resolution forward to Council at the May 15th Council meeting. The current 2012- 2016 CIP is available through the County web page for review. Any requests for County projects to be included in the new CIP can be made through City Staff by June 13th so Council can review and formally submit requests to the County by the June 25th deadline. Gun Club Lake Watershed Management Organization (GCLWMO) - Staff met with representatives from the Cities of Eagan and Inver Grove Heights, along with a representative from the Board of Water and Soil Resources (BWSR), to discuss future changes to the management structure of the GCLWMO. No decisions were made to propose changes to the GCLWMO structure, but a proposal is anticipated at the GCLWMO June meeting. Additional discussion meetings are anticipated in May and June. MnDOT & Dakota County Projects The following projects are under the direction of MnDOT and Dakota County. They are presented as information only. For more information on MnDOT projects contact J.P. Gillach (651-234-7503, james.gillach@state.mn.us). Highway 13 Resurfacing (MnDOT) - The resurfacing of Highway 13, along with drainage improvements and ADA upgrades between I -35W and Annapolis Street (Burnsville to West St. Paul) is scheduled for the summer of 2012. The portion of Highway 13 from 2nd Street in Mendota to I -35E in Lilydale will be exempted from this project and reconstructed in 2015 under a separate MnDOT project. The project schedule includes the following construction period for Mendota Heights segments of the project: - May 15-24: Hwy 13 from Hwy 55 to Saint Peters Church. Periodic single lane traffic with requested detour route to Old Sibley Memorial Highway - June 8 -July 26: Hwy 13 from Wachtler to Annapolis. Periodic full road closures expected. Detour will be provided. Schedule signs will be posted prior to closures. Highway 110 Resurfacing (MnDOT) - A small portion of Highway 110 from Lexington Avenue east to the I -35E Bridge, along with spot repairs between Lexington and Highway 13 is being resurfaced. Construction is underway and is anticipated to continue through the end of next week. The access ramp to/from northbound I -35E is included in the project. Turnback of Old Sibley Memorial Highway (MnDOT) - MnDOT intends to vacate the Right -of -Way for the Old Sibley Memorial Highway due to a redundant route requirement. Concept plans and alternatives are being developed for the land use once it is vacated. Once alternatives are developed, public meetings are anticipated. Lexington Avenue Resurfacing (County) - Dakota County will be resurfacing Lexington Avenue from just north of Highway 110 (Vail Drive) south to Mendota Heights Road in 2012. Construction is anticipated to begin shortly after MnDOT completes the Highway 110 resurfacing project. For more information contact the Dakota County Transportation Department at 952-891-7100.