Pipeline 05 18 2012N E W S The Pipeline 0
LETTER
Public Works
Engineering May 18, 2012
Code Enforcement rk�:2� -�
Public Works
The Parks Crew started up the irrigation systems at
Mendakota Park, Kensington Park, City Hall, and the
Fire Hall. Broken sprinkler heads were replaced, where
needed. The Ivy Falls Park general skating rink was
leveled out. A downed tree was removed from the
pedway in Friendly Hills Park. A new storage box was
installed at Mendakota Park by the utility building.
The Utilities Crew sprayed for weeds in the right-of-
ways, along guard rails, and along the pedways. A
sanitary sewer inspection was done on Stockbridge
Court.
The Streets Crew installed a no outlet sign and post for
Apache Court and Apache Lane. A new post for the no
parking sign at the old fire hall site was installed. The
Somerset Road street sign was fixed. Boulevard repair
work was done at Second Avenue and Dodd Road.
Blacktop was cut for storm sewer repair on Mendota
Heights Road by St. Thomas Academy. The inside of
the manhole was bricked up where it had washed out
under the road. The street was then blacktopped.
Trees were cut in the woods to create a path as
requested by the Police so they could remove a
deceased male.