Pipeline 06 29 2012NEWS
LETTERa
The Pipeline
�m
Public Works
Engineering j June 29, 2012
Code Enforcement!!I
Public Works
The Parks Crew continues hauling brush with the Streets Crew. The downed
tree limb on the Wentworth Park playground equipment was cleaned up and
parts were ordered to fix the damage. Downed trees were cleaned up on
the pedway in Valley Park by Highway 13. Rogers Lake Park was prepared
for the fishing derby on Wednesday night.
The Streets Crew continues to clean up downed trees and limbs from the
storm last week.
Engineering
Lemay Lake Road Reconstruction -Contract was awarded to Valley Paving at
the June 19th City Council meeting. Construction is anticipated to begin in
late July.
Marie Avenue Rehabilitation - The contractor has been installing new water
main. Most of the large main has been installed. A portion has been filled
with water and will be undergoing a pressure test and bacteria test on
Friday. If all the tests pass, the contractor will begin reconnecting services
to the main. Marie Avenue is closed to through traffic. A signed detour is
provided. Construction is anticipated to last through July.
Diane Road Neighborhood - The contractor is working through the final
punch -list items. Project is otherwise complete. An assessment hearing is
scheduled for October.
Mendota Heights Road Rehabilitation -The contractor is working through the
final punch -list items. Project is otherwise complete. An assessment
hearing is scheduled for October.
Wagon Wheel Trail Bicycle/Pedestrian Connection - The contractor has
placed the final lift of asphalt and completed the trail extension from I -35E
to Lexington Avenue. Work should be completed following a final walk
through by city staff.
Dodd Road/Highway 110 Intersection Pedestrian Improvements -Consultant
will be surveying on-site over the next several weeks, and will be scheduling
a mid -summer update before City Council.
MnDOT Proiects
The following projects are under the direction of MnDOT. They are presented
as information only. For more information on MnDOT projects contact J.P.
Gillach (651-234-7503, james.gillach@state.mn.us).
Highway 13 Resurfacing (MnDOT) - The contractor opened the section of
Highway 13 that was closed for construction on Thursday.
Highway 110 Resurfacing (MnDOT) - A small portion of Highway 110 from
Lexington Avenue east to the I -35E Bridge, along with spot repairs between
Lexington and Highway 13 is being resurfaced. Construction is underway
and is anticipated to continue through the end of July.