Loading...
Pipeline 06 29 2012NEWS LETTERa The Pipeline �m Public Works Engineering j June 29, 2012 Code Enforcement!!I Public Works The Parks Crew continues hauling brush with the Streets Crew. The downed tree limb on the Wentworth Park playground equipment was cleaned up and parts were ordered to fix the damage. Downed trees were cleaned up on the pedway in Valley Park by Highway 13. Rogers Lake Park was prepared for the fishing derby on Wednesday night. The Streets Crew continues to clean up downed trees and limbs from the storm last week. Engineering Lemay Lake Road Reconstruction -Contract was awarded to Valley Paving at the June 19th City Council meeting. Construction is anticipated to begin in late July. Marie Avenue Rehabilitation - The contractor has been installing new water main. Most of the large main has been installed. A portion has been filled with water and will be undergoing a pressure test and bacteria test on Friday. If all the tests pass, the contractor will begin reconnecting services to the main. Marie Avenue is closed to through traffic. A signed detour is provided. Construction is anticipated to last through July. Diane Road Neighborhood - The contractor is working through the final punch -list items. Project is otherwise complete. An assessment hearing is scheduled for October. Mendota Heights Road Rehabilitation -The contractor is working through the final punch -list items. Project is otherwise complete. An assessment hearing is scheduled for October. Wagon Wheel Trail Bicycle/Pedestrian Connection - The contractor has placed the final lift of asphalt and completed the trail extension from I -35E to Lexington Avenue. Work should be completed following a final walk through by city staff. Dodd Road/Highway 110 Intersection Pedestrian Improvements -Consultant will be surveying on-site over the next several weeks, and will be scheduling a mid -summer update before City Council. MnDOT Proiects The following projects are under the direction of MnDOT. They are presented as information only. For more information on MnDOT projects contact J.P. Gillach (651-234-7503, james.gillach@state.mn.us). Highway 13 Resurfacing (MnDOT) - The contractor opened the section of Highway 13 that was closed for construction on Thursday. Highway 110 Resurfacing (MnDOT) - A small portion of Highway 110 from Lexington Avenue east to the I -35E Bridge, along with spot repairs between Lexington and Highway 13 is being resurfaced. Construction is underway and is anticipated to continue through the end of July.