Pipeline 06 15 2012NEWS
The PipelineL E T T E R
Public Works,
Engineering
Code Enforcement t- June 25, 2012 + p
Public Works
The Parks Crew trimmed trees along the trail on Mendota Heights Road
between Lexington Avenue and Highway 55. A broken sprinkler head was
repaired at Mendakota Park on the soccer field. Downed trees and limbs
were removed along the trail in Valley Park and Rogers Lake. The new
Kubota zero turn was demoed.
The Utilities Crew checked the sanitary sewer manholes in the Diane Road
reconstruction area and found one piece of concrete in a manhole. Fire
hydrants were painted on Huber Drive, Decorah Lane, and Mendota Heights
Road. The sanitary sewer lines were cleaned in Hidden Creek. There was a
sanitary sewer line blockage in Mendota Heights Road. An inside drop had
broken off inside the manhole and caused a blockage. The Mendota Heights
Road main lift station was cleaned.
The Streets Crew cut and cleaned up trees that fell over the trail in Valley
Park. A tree was removed that fell over at Marie Avenue and Dodd Road on
Sunday afternoon. Limbs that were broken off and hanging were cut down
on Kirchner Avenue and in other locations where we received resident
complaints. Maintenance was done on the chipper and the blades replaced.
The grapple bucket was work on and broken hoses replaced. They helped
with the sanitary sewer line blockage on Mendota Heights Road. The grader
was brought up to Sibley High School parking lot for the Trucks and Travel
event on Wednesday evening.
Engineering
Lemay Lake Road Reconstruction -Bid opening took place on June 13tH
Valley Paving was the apparent low bidder. Contract award is scheduled for
the June 19th City Council meeting. Construction is anticipated to begin in
early to mid-July.
Marie Avenue Rehabilitation - Temporary water service has been installed,
and pavement removal has begun. Excavation for the new watermain
began Friday morning. Marie Avenue is closed to through traffic. A signed
detour is provided. Construction is anticipated to last through July.
Diane Road Neighborhood - The contractor is working through the final
punch -list items. Project is otherwise complete. An assessment hearing is
scheduled for October.
Mendota Heights Road Rehabilitation - The final lift of asphalt was installed
and striping completed. The contractor is working through the final punch -
list items. Project is otherwise complete. An assessment hearing is
scheduled for October.
Wagon Wheel Trail Bicycle/Pedestrian Connection - The contractor has
placed the final lift of asphalt and completed the trail extension from I -35E
to Lexington Avenue. Work should be complete next week followed by final
landscaping and punch -list review.
Dodd Road/Highway 110 Intersection Pedestrian Improvements - A kick-off
meeting with MnDOT was held on Wednesday morning where specific work
items associated with the project will be discussed. A scope amendment to
our Met Council grant may be necessary to include a minor relocation of a
portion of Interstate Valley Creek Trail. Consultant will be surveying on-site
over the next several weeks, and will be scheduling a mid -summer update
before City Council.
MnDOT Proiects
The following projects are under the direction of MnDOT and Dakota County.
They are presented as information only. For more information on MnDOT
projects contact J.P. Gillach (651-234-7503, james.gillach(J'1state.mn.us).
Highway 13 Resurfacing (MnDOT) - The Resurfacing of Highway 13, along
with drainage improvements and ADA upgrades between I -35W and
Annapolis Street (Burnsville to St. Paul) has been underway for a month.
The portion of Highway 13 from 2nd Street in Mendota to I -35E in Lilydale
will be exempted from this project and reconstructed in 2015 under a
separate MnDOT project. The Highway 55 to Highway 110 portion of the
project is paved and striped. Highway 13 north of Wachtler Avenue to
Sylvandale Avenue is closed to through traffic through June 26th. A
signed detour for traffic is provided.
Highway 110 Resurfacing (MnDOT) - A small portion of Highway 110 from
Lexington Avenue east to the I -35E Bridge, along with spot repairs between
Lexington and Highway 13 is being resurfaced. Construction is underway
and is anticipated to continue through the end of July. Ramp form
westbound Highway 110 to Southbound I -35E will be closed on
Monday June 18th- through June 25th-. Ramp from southbound I -35E
to eastbound Highway 110 will remain open.
Old Sibley Memorial Highway (MnDOTI - Staff met with the pastor of Saint
Peter's Catholic Church on Thursday to go over the particulars of the MnDOT
proposal. MnDOT has informed affected local communities of their need to
vacate the Right -of -Way for the Old Sibley Memorial Highway from Highway
13 near Saint Peters Church to Highway 13 at Mendota Heights Road due to
a redundant route requirement. Concept plans and alternatives are being
developed for the land use once it is vacated. MnDOT will be presenting
potential alternatives to local City Councils and holding public open houses
later this summer and fall.