Loading...
Pipeline 06 01 2012N E W S LETTER ilk,, Public Works Engineering Code Enforcement I A 9 Public Works The Pipeline June 1, 2012 The Parks crew cleaned up downed trees and limbs from the weekend storms. Mendakota Park was prepared for the park celebration this Saturday. The broken tunnel end was replaced on the playground equipment at Mendakota Park. The Utilities Crew assisted the Street Crew with storm water pond outlet blockages near Copperfield Pond, Bituminous Roadways pond and Cherry Hills 2 storm water pond. A pump was set up at Par 3 near Bachelor Avenue as the outlet pipe for the pond is broken. Utilities Crew also attended safety meetings in South Saint Paul and Mendota Heights. The Streets crew cleaned storm sewer grates. Brush was hauled out of Ivy Falls Park and Rogers Lake Park. A downed tree was cut up and cleared from a city easement on Faro Lane. Trees were cut back at the parking lot by the Police Department. Trees were trimmed back at Ivy Falls Drive at Dodd Road north and south. Trees were also trimmed at Ivy Hill Drive and Sylvandale Road. Engineering Lemay Lake Road Reconstruction - The project is being advertised. Bid opening is scheduled for June 13th at 10:00 am. Contract award is scheduled for the June 19th City Council meeting. Construction is anticipated to begin in early July. Marie Avenue Rehabilitation - Temporary water service has been installed and construction is anticipated to begin next week and last through the end of June or early July. Staff is requesting the contractor provide at least 48 hour notice to residents before closing the road for construction. Access for residents will be maintained. Diane Road Neighborhood - Paving in the Diane Road subdivision and Eagle Ridge Road is complete. A final inspection and punch -list completion is expected for next week. An assessment hearing is scheduled for October. Mendota Heights Road Rehabilitation - The final lift of asphalt is scheduled for installation this weekend, and striping will take place next week. A final inspection and punch-list completion is anticipated by June 15th. An assessment hearing is scheduled for October. Wagon Wheel Trail Bicycle/Pedestrian Connection - McNamara Construction will be placing the final lift of asphalt on Wagon Wheel Trail later this month. They will also be installing the remaining section of trail form I-35E to Lexington Avenue. City Council approved this section of trail at their May 15th meeting. Gun Club Lake Watershed Management Organization (GCLWMO� - The ongoing discussion of the future structure of the GCLWMO will be brought to its neighboring WMO next week. The Lower Mississippi River WMO will be discussing the issue at their June 7th meeting in Inver Grove Heights. One of the many possibilities being discussed is the potential to merge the two WMOs into one, or for the two to share plans. GCLWMO will be discussing the same issue at their board meeting on June 20th Dodd Road/Highway 110 Intersection Pedestrian Improvements - The consultant is setting up kick-off meetings with MnDOT to discuss project requirements and limitations. Consultant will be surveying on-site over the next several weeks, and will be scheduling a mid-summer update before City Council. Dakota County One-Stop Right-of-Way Permitting Program - Dakota County staff is setting up a shared right-of-way permitting program for the County and cities to participate in. Staff recently received a copy of the proposed agreement between governmental bodies, and is anticipating having it on the June 5th City Council agenda for discussion and potential approval. Lower Mississippi River Watershed Management Organization (LMRWMO) - The next LMRWMO Board meeting is Thursday June 7th at the Inver Grove Heights Community Center. In addition to the GCLWMO issue mentioned above, the LMRWMO Board will be discussing the upcoming MPCA WRAP program which will provide management and pollution prevention plans for area water bodies. Rogers Lake is included in the MPCA program. MnDOT Corridor Investment Management Strategy (CIMS) - Staff attended an open house on Thursday to learn about the new CIMS program. CIMS is a strategy that looks at projects from a corridor perspective and is intended to help partner MnDOT with local communities to produce better and timelier projects centered on area economic impact. The CIMS program is looking at major freeways to start (I-494, I-35E, Hwy 55), and will be building the program to include non-freeway roads (Hwy 149, Hwy 110, Hwy 13) in the coming years. MnDOT & Dakota Countv Proiects The following projects are under the direction of MnDOT and Dakota County. They are presented as information only. For more information on MnDOT projects contact J.P. Gillach (651-234-7503, james.gillach@state.mn.us). Highway 13 Resurfacing (MnDOT) - The Resurfacing of Highway 13, along with drainage improvements and ADA upgrades between I -35W and Annapolis Street (Burnsville to St. Paul) is underway. The portion of Highway 13 from 2nd Street in Mendota to I -35E in Lilydale will be exempted from this project and reconstructed in 2015 under a separate MnDOT project. The Highway 55 to Highway 110 portion of the project is essentially complete. Construction in Mendota is expected throughout June and July. Highway 13 north of Wachtler Avenue to Sylvandale Avenue is closed to through traffic through June 26th. A signed detour for traffic is provided. Highway 110 Resurfacing (MnDOT) - A small portion of Highway 110 from Lexington Avenue east to the I -35E Bridge, along with spot repairs between Lexington and Highway 13 is being resurfaced. Construction is underway and is anticipated to continue into June. Work at the southbound I -35E ramps to and from Highway 110 is complete and the ramps are re- opened. Ramps to and from northbound I -35E will be closed on June 1St and are scheduled to re -open at 5:30pm on June 7th. Old Sibley Memorial Highway (MnDOT� - MnDOT has informed affected local communities of their intent to vacate the Right -of -Way for the Old Sibley Memorial Highway from Highway 13 near Saint Peters Church to Highway 13 at Mendota Heights Road due to a redundant route requirement. Concept plans and alternatives are being developed for the land use once it is vacated. MnDOT will be presenting potential alternatives to local City Councils and holding public open houses later this summer and fall. Lexington Avenue Resurfacing (Countyl - Dakota County has completed resurfacing Lexington Avenue from south to Mendota Heights Road. Some minor shoulder work remains and work is anticipated to be complete by the end of next week. For more information contact the Dakota County Transportation Department at 952-891-7100.