Loading...
Pipeline 07 06 2012N E W S The Pipeline LETTER Public Works Engineering 700 Code EnforcementJuly 6, 2012 Public Works The Parks Crew are repairing a lot of sprinkler heads. There was graffiti painted on the pavilion and the tunnel at Valley Park that was covered up with paint. They are helping the Streets Crew with picking up tree debris removal. The Utilities Crew was called in on Sunday at 12:30 p.m. for a possible sanitary sewer backup on Woodridge. The problem was found in the homeowner's service. There was a high water alarm on July 4th at 9:00 a.m. at the Mendota Heights Road lift station. The pumps had overheated. The pumps were reset and made operational again. They are assisting the Streets Crew with tree debris removal. The Streets Crew continues to clean up downed trees and limbs from the storm a couple of weeks ago. The attached map tracks their progress. Engineering Lemay Lake Road Reconstruction - The contract was awarded at the June 19th City Council meeting and the contract has been executed. A pre - construction meeting will be set up in the coming week. Construction is anticipated to begin mid to late July. Marie Avenue Rehabilitation - Temporary water service has been installed. Stormwater pond construction, roadway excavation, and watermain replacement are underway. Marie Avenue is closed to through traffic. A signed detour is provided. Construction is anticipated to last through July. Dodd Road/Hiahwav 110 Intersection Pedestrian Improvements - The consultant is surveying the intersection this week and will begin drawing up preliminary plans in July. A stakeholder letter is scheduled to be sent out this month to get input into the project design. A mid to late summer update is planned at a regularly scheduled City Council meeting. Hunter Lane/Orchard Place Reconstruction - A resident survey letter has been sent out to get preliminary issues identified for preliminary project design. A neighborhood meeting is scheduled for September followed by a formal public hearing before City Council in October. MnDOT Proiects The following projects are under the direction of MnDOT and Dakota County. They are presented as information only. For more information on MnDOT projects contact J.P. Gillach (651-234-7503, james.gillach@state.mn.us. Highway 13 Resurfacing (MnDOT) - The Resurfacing of Highway 13, along with drainage improvements and ADA upgrades between I -35W and Annapolis Street (Burnsville to St. Paul) has been underway since May. The portion of Highway 13 from 2nd Street in Mendota to I -35E in Lilydale will be exempted from this project and reconstructed in 2015 under a separate MnDOT project. The Highway 55 to Highway 110 portion of the project is paved and striped, as is the portion from Wachtler Avenue north to Annapolis Street. The portion of Highway 13 through Mendota is scheduled to be resurfaced later in July. Highway 110 Resurfacing (MnDOT) - A small portion of Highway 110 from Lexington Avenue east to the I -35E Bridge, along with spot repairs between Lexington and Highway 13 is being resurfaced. Construction is underway and is anticipated to continue through the end of July. Old Sibley Memorial Highway (MnDOT� - MnDOT has informed affected local communities of their need to vacate the Right -of -Way for the Old Sibley Memorial Highway from Highway 13 near Saint Peters Church to Highway 13 at Mendota Heights Road due to it being a redundant right-of-way route. Concept plans and alternatives are being developed for the land use once it is vacated. MnDOT will be presenting potential alternatives to local City Councils and holding public open houses later this summer and fall.