Pipeline 07 13 2012NEWS The Pipeline
.i
LETTER
Public Works
Engineering
31
Code Enforcement July 13, 2012 FRIDAY
Public Works
The Parks Crew worked on the sprinkler systems at Mendakota Park and
Kensington Park. The finished hauling downed trees and limbs to
Mendakota Park. Graffiti was covered up at Valley Park on the pavilion walls
and the tunnel under Marie Avenue.
The Utilities Crew painted the Lilydale lift panel that was vandalized again.
Sanitary sewer lines were cleaned on Bachelor Avenue, Bachelor easement, Sutton
Road, and Trail Road. The storm sewer pipe on Chippewa Avenue was cleaned.
He met with engineering and the wastewater consultant about rehabbing the
Veronica lift station.
The Streets Crew finished the curb side pickup of downed trees and limbs. The
tub grinder is at Mendakota Park and chipping up the debris. About one third of it
was chipped up on Thursday. The estimated finish date is Tuesday.
Engineering
Lemay Lake Road Reconstruction -A pre -construction meeting is scheduled
for July 13th. The contractor should supply the city with an estimated
schedule at the meeting. Construction is anticipated to begin late July.
Marie Avenue Rehabilitation - Water main is installed but there have been
problems getting it to pass water quality standards. St. Paul Water
continues to flush and reflush the main with highly chlorinated water. Once
the main passes the contractor will begin reconnecting services. Storm
water pond construction is underway. Marie Avenue is closed to through
traffic. A signed detour is provided. Construction is anticipated to last
through July.
Dodd Road/Hiahwav 110 Intersection Pedestrian Improvements - The
consultant is surveying the intersection this week and will begin drawing up
preliminary plans in July. A stakeholder letter is scheduled to be sent out
this month to get input into the project design. A mid to late summer
update is planned at a regularly scheduled City Council meeting.
Hunter Lane/Orchard Place Reconstruction - A resident survey letter has
been sent out to get preliminary issues identified for preliminary project
design. A neighborhood meeting is scheduled for September followed by a
formal public hearing before City Council in October.
MnDOT Proiects
The following projects are under the direction of MnDOT and Dakota County.
They are presented as information only. For more information on MnDOT
projects contact J.P. Gillach (651-234-7503, james.gillach@state.mn.us).
Highway 13 Resurfacing (MnDOT) - The Resurfacing of Highway 13, along
with drainage improvements and ADA upgrades between I -35W and
Annapolis Street (Burnsville to St. Paul) has been underway since May. The
portion of Highway 13 from 2nd Street in Mendota to I -35E in Lilydale will be
exempted from this project and reconstructed in 2015 under a separate
MnDOT project. The Highway 55 to Highway 110 portion of the project is
paved and striped, as is the portion from Wachtler Avenue north to
Annapolis Street. The portion of Highway 13 through Mendota is
scheduled to be resurfaced later in July.
Highway 110 Resurfacing (MnDOT) - Highway 110 is nearing completion.
Lanes have been restored and minor touch up items remain.
Old Sibley Memorial Highway (MnDOTJ - MnDOT has informed affected local
communities of their need to vacate the Right -of -Way for the Old Sibley
Memorial Highway from Highway 13 near Saint Peters Church to Highway 13
at Mendota Heights Road due to it being a redundant right-of-way route.
Concept plans and alternatives are being developed for the land use once it
is vacated. MnDOT will be presenting potential alternatives to local City
Councils and holding public open houses later this summer and fall.