Pipeline 12 07 2012NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The Pipeline
December 7, 2012 vVt)
The Parks Crew worked on replacing the roof and radio on unit #5910. The
hoses, fittings and hydrant wrenches were brought to the warming houses
for flooding. Holes were filled in around the warming house at Marie Park.
Flooding of the ice rinks has started.
The Utilities Crew changed out pump 2 "time delay relay" at the Culligan lift
station. HVAC filters were changed out along with the fan belts at the
Mendota Heights Road lift station. Bobby inspected a sanitary sewer line at
557 Junction Lane for a service repair. The Lilydale lift station's panels were
painted to cover graffiti, hopefully for the last time this year.
The Streets Crew cleaned up brush left by Xcel on Ivy Falls Court. New tires
were put on the John Deere backhoe. The sander was put on the plow truck
box. The tractor was steam cleaned and greased.
Engineering
City Projects (construction year)
Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) -
The consultant is setting up a utility coordination meeting with the owners
of all private utilities in the intersection. This meeting is designed to
minimize conflicts and activities for an efficient project construction. The
consultant will be providing the City Council with an update and review of
the final design plans at the December 18th City Council meeting. Final
plans are anticipated over the winter with bidding and construction in 2013.
Hunter Lane/Orchard Place Neighborhood Improvements (2013 - Staff is
working on the final design plans. A second informational meeting is
anticipated over the winter to go over specific property design issues with
affected residents. Final plan completion is expected in late winter/early
spring with construction starting in June 2013.
Crown Point & Overlook Neighborhood Rehabilitations (2013) -Staff is
working on the final design plans. If necessary, a neighborhood open house
will be held over the winter to work out specific design issues with property
owners. Final plans will be prepared anticipating spring 2013 construction.
Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Avenue (2013) -
Staff is preparing design plans for a trail rehabilitation project to be
completed during the summer of 2013. Dakota County has included this
project in their Capital Improvement Plan (CIP) to augment project cost.
The City is responsible for 55% of the construction cost and design services,
and the County will provide 45% of the construction cost.
County Projects
North Urban Regional Trail (NURT) Realignment - Staff met with officials at
Dakota County to discuss the proposed realignment of the NURT between
Highway 110 and Warrior Drive in Mendota Heights and Marie Avenue and
Charlton in West Saint Paul. Dakota County is considering three alignment
alternatives for the project: Dodge Nature Canter in West Saint Paul,
utilizing the new Delaware Avenue Trail, or Warrior Drive in Mendota
Heights. The County is discussing the alignment with Dodge Nature Center
as that is the County's preferred option. Public meetings on the realignment
are anticipated over the winter.
Blue Thumb Program - Dakota County Soil and Water Conservation district
has set the 2013 Blue Thumb schedule of seminars. The Blue Thumb
program is for area residents interested in building rain gardens on their
property to assist in storm water runoff control and treatment. The
program outline and schedule of seminars is attached.
State Projects
Highway 149/Interstate 494 Improvements - Staff attended a meeting with
MnDOT and the City of Eagan about the pending reconstruction project for
Dodd Road south of Interstate 494 in Eagan. The project, scheduled for
2014 construction may include reconstruction of the interchange ramps at
Dodd an I-494, along with traffic signal replacement. Also scheduled for
2014 construction is the resurfacing of Dodd Road from I-494 to Annapolis
Street in Mendota Heights. The projects are in the preliminary stages of
design and more information will be shared in the near future.
Other Activities
Five -Year Infrastructure Plans - Staff is working on updates for the Street
Improvement Plan (SIP) and the Sanitary Sewer Improvement and
Maintenance Plan (SSIMP). Projects within the plans are being prioritized
based on infrastructure need and available resources. The 2013-2017 plans
will be presented to City Council at the December 18th meeting. Staff is also
working on completing a Trail Improvement and Maintenance Plan (TIMP)
for Council review early in 2013. Once acknowledged, the plans will be
posted on the City's web -page.
Future Cities Competition - Staff continues to volunteer as the Engineering
Mentor at Friendly Hills Middle School for the Future Cities Program. This
week the Public Works Director joined the PWDs from Eagan and West Saint
Paul to serve and "mock judges" of the students' project presentations. The
competition is January 19th and the practice presentations will help the
students feel more comfortable during the actual presentation.
Gun Club Lake Watershed Management Organization (GCLWMO� - Staff
attended the quarterly meeting of the GCLWMO in Eagan. At the meeting
the Board decided on their future governance model that had been under
scrutiny for most of 2012. The Board decided to restructure their mission to
delegate most of the compliance related activities to the member Cities, and
to adopt a few over -arching activities they could accomplish on behalf of all
member cities. This model is very similar to the Lower Mississippi River
WMO structure, and the GCLWMO will be restructuring their management
plan to reflect these changes.