Loading...
Pipeline 12 28 2012N E W S The Pipeline LETTER WPT Public Works Engineering Code Enforcement December 28, 2012 2014 '" Public Works The Parks Crew continued to flood the skating rinks in the parks. They plowed the rinks and pedways. Hockey goals were brought out to the rinks. Leaky fire hoses were replaced at Marie Park and Friendly Hills that were used to flood the rinks. The Utilities Crew plowed the cul-de-sacs and lift stations. The residents at 649 Marie Avenue called about a blockage in their sanitary sewer line. The sanitary sewer line was checked and the City's line was clear. Assisted with changing out batteries on two fire trucks. The Streets Crew salted the streets after the snowfall on Sunday. They performed maintenance on the plow trucks and cleaned the shop. Engineering City Projects (construction year) Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) - The consultant will be providing the City Council with an update and review of the final design plans at the January 15th City Council meeting. Final plans are anticipated over the winter with bidding and construction in 2013. Hunter Lane/Orchard Place Neighborhood Improvements (20131 -A second neighborhood informational meeting is anticipated later this winter to go over specific property design issues with residents. Final plan completion is expected in late winter/early spring with construction starting in June 2013. Crown Point & Overlook Neighborhood Rehabilitations (2013) - An open house will be held over the winter, if necessary, to work out specific design issues with property owners. Final plans will be prepared anticipating spring 2013 construction. Lexinaton Avenue Pedestrian Trail, Hwv 110 to Doualas Avenue (2013) - Staff is designing the rehabilitation for construction during 2013. Dakota County has included this in their Capital Improvement Plan (CIP) and will augment project cost. Plans will be included with one of the City's street projects. Highway 13 Trail Connection (20131 - Staff is planning construction of a trail connection along the south side of Highway 13 to connect the pedestrian trail from Riverside Lane to Lilydale Road. More information will be published about this project over the winter. State Projects Highway 149 (Dodd Road) Rehabilitation & I-494 Ramp Improvements - City of Eagan is sponsoring a reconstruction project for Dodd Road south of Interstate 494 (including the south I-494 interchange ramp) in 2014. This project will impact traffic for Mendota Heights during construction. Reconstruction of the north interchange ramp is also scheduled for reconstruction by MnDOT in 2014 under a separate project. Rehabilitation of Dodd Road from I-494 to 7t" Street in Saint Paul is also planned for 2015 construction. All these projects are in the preliminary stages of design and more information will be shared in the near future. Other Activities Lower Mississippi River Watershed Management Organization (LMRWMOJ - Staff is working with the LMRWMO's consultant on the Watershed Restoration and Protection (WRAP) study. This program is looking at Rogers Lake and Lake Augusta for water quality. The WRAP program will produce lake management plans for each water body that the City and residents can use to better protect the water quality of the lakes. The next meeting of the LMRWMO Board will be February 7, 2013 at Mendota Heights City Hall.