December 21, 2012
Winter
solstice
Parks Crew continued flooding of the ice rinks. They plowed the cul-de-sacs,
parking lots and rinks. Unit #501 was serviced. They tested all the batteries in
warming house smoke detectors, and repaired the door to the warming house at
Marie Park.
Utilities Crew completed a sanitary sewer inspection at 755 Wentworth
Avenue. They assisted the Streets Crew with the snowfall by plowing the
cul-de-sacs and the middle area of the city. A fire hydrant flag was changed
on Kendon Lane.
The Streets Crew picked up a 46" tv that was dropped on Warrior Drive
across from Sibley Court. A sign was installed for the roundabout that had
been run over. Work was done on truck 303, the hydraulic fitting was
leaking and fixed. It was an early start on Thursday plowing and salting the
streets with the overnight snow fall.
Engineering
City Projects (construction year)
Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) -
The consultant is setting up a utility coordination meeting with the owners
of all private utilities in the intersection. The consultant will be providing
the City Council with an update and review of the final design plans at the
January 15th City Council meeting. The final plan coordination through
MnDOT offices is taking slightly longer than anticipated. Final plans are
anticipated over the winter with bidding and construction in 2013.
Hunter Lane/Orchard Place Neighborhood Improvements (2013 - Staff is
working on the final design plans. A second informational meeting is
anticipated later this winter to go over specific property design issues with
affected residents. Final plan completion is expected in late winter/early
spring with construction starting in June 2013.
Crown Point & Overlook Neighborhood Rehabilitations (2013) -Staff is
working on the final design plans. If necessary, a neighborhood open house
will be held over the winter to work out specific design issues with property
owners. Final plans will be prepared anticipating spring 2013 construction.
Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Avenue (2013) -
Staff is preparing design plans for a trail rehabilitation project to be
completed during the summer of 2013. Dakota County has included this
project in their Capital Improvement Plan (CIP) to augment project cost.
The City is responsible for 55% of the construction cost and design services,
and the County will provide 45% of the construction cost. Plans will likely
be bid with one of the City's street projects this spring.
Highway 13 Trail Connection (20131 - Staff is anticipating construction of a
trail connection along the south side of Highway 13 to connect the
pedestrian trail from Riverside Lane to Lilydale Road. More information will
be published about this project over the winter.
State Projects
Highway 149/Interstate 494 Ramp Improvements - Staff has been talking
with both MnDOT and the City of Eagan about the pending reconstruction
project for Dodd Road south of Interstate 494 in Eagan. This project will
impact traffic for Mendota Heights during construction and a pedestrian trai
extension is included in the project that will bring the trail up to the south
side of the I-494 Bridge. Reconstruction of the south interchange ramp at
Dodd an I-494 is included in the City of Eagan sponsored project, and the
north ramp is scheduled for reconstruction by MnDOT under a separate
project. Resurfacing of Dodd Road from I-494 to Annapolis Street in
Mendota Heights is also planned for 2015 construction. All these projects
are in the preliminary stages of design and more information will be shared
in the near future.
Other Activities
Five -Year Infrastructure Plans - Council approved the 2013-2017 Street
Improvement Plan (SIP) and Sanitary Sewer Improvement and Maintenance
Plan (SSIMP) at their December 18th meeting. Projects within the plans are
prioritized based on infrastructure need and available resources. The
updated plans will be published on the City web page by the end of the
year. Staff is also completing a Trail Improvement and Maintenance Plan
(TIMP) for Council review in 2013. The TIMP was presented in draft form to
the Parks and Recreation Commission on December 11th. The Commission
will be offering suggestions on prioritization of trail projects and potential
funding sources. Once approved by the City Council, the plan will be posted
on the City's web -page along with the other Infrastructure Plans.
Lower Mississippi River Watershed Management Organization (LMRWMOJ -
Staff attended the monthly LMRWMO meeting on Thursday. At the meeting
the Board approved a fee schedule for Dakota County Soil and Water
Conservation District to provide administrative services to the LMRWMO,
received an update on the Watershed Restoration and Protection (WRAP)
study, approved the 2013 meeting schedule, and debated making a cost
share allocation determination for a project in Inver Grove Heights, West
Saint Paul, South Saint Paul, and Sunfish Lake. The next meeting of the
LMRWMO Board will be February 7, 2013 at Mendota Heights City Hall.