Loading...
Pipeline 08 17 2012N E W S fig, The Pipeline L E T T E R Public Works\ �-August 17, 2012 Engineering ( Code Enforcement Public Works The Parks Crew picked up downed limbs in Wentworth Park and at the Public Works Garage. The storage box was brought in from Mendakota Park that was used by Parks and Recreation. They continue to spray weeds in the parks and pedways, where needed. Replacement boards were installed in the hockey rinks, where needed. The Utilities Crew cleaned sanitary sewer lines on North and South Freeway Road, South Lane, Oak Street, and the easement near Mendota Plaza. Roots were cut in the sanitary sewer line on Hingham Court, Chippewa Avenue, and Annapolis Street. A sanitary sewer and storm sewer inspection was completed at Whispering Pines at Mendota Plaza. The Streets Crew made up elections signs, and picked up tree limbs on Kirchner Avenue and along Hunter Lane. A new sign post was installed on Medallion Drive and at Mayfield Heights Road at Highway 13. A bent sign post was replaced at Mendakota Drive at Dodd Road. The bent gate at the Pilot Knob site was fixed. The ditch line was cleaned out south on Lexington Avenue because of a sight distance complaint. Engineering (2012) Lemay Lake Road Reconstruction - Stormwater pond construction is complete, and storm sewer installation is under way. Pavement reclaiming is also under way. Substantial project completion is expected in October, and an assessment hearing for the project is scheduled for the October 16th City Council meeting. (2012) Marie Avenue Rehabilitation - The contractor has replaced worn or damaged sections of curb, and is now making soil corrections in preparation for placing pavement. Marie Avenue remains closed to through traffic. A signed detour is provided. Construction is anticipated to last into September. An assessment hearing for the project is scheduled at the October 2nd City Council meeting. (2013) Dodd Road/Highway 110 Intersection Pedestrian Improvements - Staff and the consultant met with MnDOT representatives on site last week to go over design details for the project. The detailed information received will be incorporated into the plans for construction. Staff is preparing a scope change request for the Met Council to include the relocation of a small portion Interstate Valley Creek Trail, which is adjacent to the intersection. A stakeholder letter is scheduled to be sent out this fall to get input into the project design from interested parties. The consultant is scheduled to present an update to City Council at their September 18th meeting. (2013) Hunter Lane/Orchard Place Neighborhood Improvements - A resident survey letter has been sent out to get preliminary issues identified for preliminary project design. The Feasibility Report for the project is scheduled for the August 21St City Council Meeting. If the Feasibility Report is accepted by Council, a neighborhood meeting is scheduled for September 17th followed by a formal public hearing before City Council on October 2nd. (2013) Crown Point & Overlook Neighborhood Rehabilitations - The Feasibility Report for these projects was approved at the August 7th City Council Meeting. A neighborhood meeting is scheduled for August 27th, and a formal public hearing is scheduled before City Council at their September 18th meeting. (2013) Highway 13 and Dodd Road Trail Construction - Staff is contacting the consultant used originally for the design of trail gap connection projects along Highway 13 and Dodd Road. These projects are programmed for 2013 construction. A grant application is necessary for funding to complete the Dodd Road trail from Market Street to Marie Avenue. Application for a DNR (Legacy funding) grant will be made early next year. Engineering Intern Goes Back to School - This week, the Engineering Ar Department bid farewell to Kevin Shay, our summer intern. Kevin is returning to Purdue University, where he will be starting his junior year in their Civil Engineering program. Kevin provide much needed assistance with our construction projects this summer, and was extremely valuable in helping get the data in our GIS system up- to-date. Engineering staff took Kevin to lunch, and he got to have his "exit interview" in a very unique location (see photo). Interstate Valley Creek Trail (IVCT) Repairs - The following statement was provided by Xcel Energy on the status of re -paving IVCT: "Xcel Energy's gas department is undergoing a major system integrity project beginning the week of August 13th. K S Energy Services is the company's contractor that will be working in the area thru mid-October. Xcel Energy and K S Energy Services will be utilizing the Valley Park trail to transport equipment for the project work. Once their construction work is completed, the trail will be restored and blacktopped. They are anticipating that the trail will be completely restored by the late October/early November timeframe. Xcel Energy extends its apologies for any inconvenience its project has created for the Mendota Heights residents who utilize the Valley Park trail system." Staff continues to work with Xcel and regular updates on their gas main project, which will culminate with the re -paving of IVCT. MnDOT Projects The following projects are under the direction of MnDOT and Dakota County. They are presented as information only. For more information on MnDOT projects contact J.P. Gillach (651-234-7503, james.gillach@state.mn.us). Old Sibley Memorial Highway - MnDOT has informed other affected agencies, including the City of Mendota Heights, of their intention to give up the right-of-way for Old Sibley Memorial Highway from Highway 13 at Mendota Heights Road to Highway 13 near Saint Peter's Church. MnDOT has decided that before any open houses or other forms of public meetings take place, they should meet with the Dakota County Board of Commissioners and Mendota Heights City Council to discuss potential alternatives. These meetings will likely be held over the winter.