Loading...
2015-01-09 Friday News - Remember to keep fire hydrants clear of snow. This will help the firefighters save time - - in the event of a fire. The Pipeline N E W S L E T T E R Public Works Engineering January 9, 2015 Code Enforcement Public Works The Parks Crew plowed the cul-de-sacs, pedways, parking lots and ice rinks. Flooding of the ice rinks continues. Additional aerator signs were installed around the open water on Rogers Lake. Maintenance and repairs were done on truck 500, 501 and the Kubota. The Utilities Crew checked the lift stations daily. Lift stations were plowed and shoveled. Housekeeping of the chemical products at Public Works continues. Cul-de-sacs in the middle area of the City were plowed. Staff attended the APWA leadership class. Salt was delivered and it was stored and loaded onto the trucks. A couple of plow trucks were fixed that had broken down. Engineering City Projects (construction year) Highway 13 Trail Connection (2014/2015) This project is buttoned up for the winter. Saint Paul Regional Water Service has completed the lowering of the water main, and cover has been established over the pipe. The reminder of the project will be completed in the spring as soon as weather and road restriction limits permit. Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation (2014/2015) The first phase of the project is complete. Design of the second phase (Marie to Lexington) is underway. A neighborhood meeting is anticipated in late January/early February to discuss site specific design requirements. The curb line at the northeast corner of Douglas Road and Victoria will be adjusted in conjunction with the next phase of construction. County Projects Highway 110 Trail Underpass (2017) This project proposes to construct an underpass (tunnel) under Highway 110 for the future construction of the Mendota-Lebanon Hills Greenway Trail. Dakota County has received a $1,000,000 grant from the Metropolitan Council for construction. County staff has issued a Request for Proposal (RFP) to consulting firms for design services. Proposals received will be reviewed in late January. If approved for construction, the rehabilitation project for Highway 110. That project is scheduled for 2017 construction. Dakota County is planning on presenting the project to City Council in February. State Projects 2015 State Project List The list of metro projects for 2015 has been released. Projects that will have an impact on Mendota Heights include: -A sealcoat will be applied to Dodd Road (Highway 149) from The Village south to Lake Drive. -Highway 110 between Highway 13 to I-35E will receive surface pavement rehabilitation (overlay). Other Activities Future Cities Competition Staff met with the Friendly Hills Middle School Future Cities teams on Wednesday. Teams are putting the finishing touches on their scale models and practicing their presentations. Friendly Hills will th be sending three teams to the State competition on January 17 at the University of Minnesota. Emerald Ash Borer The Emerald Ash Borer (EAB) has been detected in Dakota County. An infested tree was discovered in Lebanon Hills Regional Park in Eagan. As a result of this discovery, Dakota County will be placed in (MDA). Staff attended an informational meeting about the quarantine status hosted by the MDA on Thursday. There are three easy steps Minnesotans can take to keep EAB from spreading: Buy firewood locally from approved vendors, and burn it where you buy it; Be aware of the quarantine restrictions. If you live in a quarantined county, be aware of the restrictions on movement of products such as ash trees, wood chips, and firewood. Details can be found online at http://www.mda.state.mn.us/en/plants/pestmanagement/eab/regulatoryi nfo.aspx; and, Watch your ash trees for infestation. If you think your ash tree is infested, go to www.mda.state.mn.us at 888- 545-6684 or emailing Arrest.The.Pest@state.mn.us to report concerns. CONTACT: Margaret Hart, MDA Communications 651-201-6131 / margaret.hart@state.mn.us